Back to bathroom remodel contractors
Truemen Painting And Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2011 to Sep 2021
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 1 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2021 | Completed final sign-off Feb 2022 | 1545 Geary | unit 6: (1) kitchen & (2) bath remodels: replace (e) kitchen contertop & sink - no location change. replace (e) light fixture - no location change. repaint whole interior of the unit. replace bathroom vanity and toilets - no location change. lighting to comply w/cec 150.0(k)Details
unit 6: (1) kitchen & (2) bath remodels: replace (e) kitchen contertop & sink - no location change. replace (e) light fixture - no location change. repaint whole interior of the unit. replace bathroom vanity and toilets - no location change. lighting to comply w/cec 150.0(k) | $20,000 |
| Mar 7, 2018 | Completed final sign-off Jul 2018 | 973 York St | remodel kitchen & bathroom in kind. change / install new recessed lighting. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remodel kitchen & bathroom in kind. change / install new recessed lighting. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $20,000 |
| Feb 21, 2013 | Completed final sign-off Feb 2014 | 2912 Sacramento St | interior renovation to 2nd floor level, header replacement & interior column removal. remodel (e) bathroom & kitchenDetails
interior renovation to 2nd floor level, header replacement & interior column removal. remodel (e) bathroom & kitchen | $20,000 |
| Feb 4, 2013 | Completed final sign-off Sep 2013 | 2742 Bush St | remodel bathroom & kitchen-replacing bathroom window with same headerDetails
remodel bathroom & kitchen-replacing bathroom window with same header | $25,000 |