Permit GraphShortlistSan Francisco building permits since 2000

True North Construction

Contractor license
680849
State license record
Based in
Larkspur
On San Francisco permits
Jan 2001 to Jul 2018
Last 24 months
0 permits filed

7 permits since 2000: 6 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllKitchen remodel 3Bathroom remodel 3

3 bathroom remodel permits: 3 completed. Typically 371 days from filing to permit and 694 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 4, 2017Completed
final sign-off Feb 2019
1762 45th Avreplace finishes in kitchen, rewire (replace knob & tube), replace sink, re-duct hood to roof, replace appliances, add insulation, new drywall, add recessed led lights, replace light & outlet at bathroom to be high efficacy.
Details
Permit
201704043133
Status
complete
Filed
Apr 4, 2017
Permit issued
Apr 4, 2017
Final sign-off
Feb 27, 2019
Declared cost
$15,000
Address
1762 45th Av

replace finishes in kitchen, rewire (replace knob & tube), replace sink, re-duct hood to roof, replace appliances, add insulation, new drywall, add recessed led lights, replace light & outlet at bathroom to be high efficacy.

Open the permit page

$15,000
Feb 7, 2017Completed
final sign-off Apr 2019
1762 45th Avlegalize an existing bathroom and (bedroom with an addition of 116 sq. ft. on the ground floor). expand entry (75.5 sq ft) within (e) footprint. several window additions/changes
Details
Permit
201702078821
Status
complete
Filed
Feb 7, 2017
Permit issued
Feb 13, 2018
Final sign-off
Apr 10, 2019
Declared cost
$50,000
Address
1762 45th Av

legalize an existing bathroom and (bedroom with an addition of 116 sq. ft. on the ground floor). expand entry (75.5 sq ft) within (e) footprint. several window additions/changes

Open the permit page

$50,000
Jun 28, 2013Completed
final sign-off Nov 2021
807 Bosworth Stdemolish (e) conc. carport in front of lot. construct new 2nd dwelling unit in front of lot living room, kitchen, 2 bedrooms, 2 baths, garage, office in (e) single family residence in mid-lot to remain. foundation work at (e) single family residence as required.
Details
Permit
201306280702
Status
complete
Filed
Jun 28, 2013
Permit issued
May 15, 2015
Final sign-off
Nov 18, 2021
Declared cost
$200,000
Address
807 Bosworth St

demolish (e) conc. carport in front of lot. construct new 2nd dwelling unit in front of lot living room, kitchen, 2 bedrooms, 2 baths, garage, office in (e) single family residence in mid-lot to remain. foundation work at (e) single family residence as required.

Open the permit page

$200,000