Back to bathroom remodel contractors
True Line Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Jul 2026
- Last 24 months
- 3 permits filed
42 permits since 2000: 36 completed, 1 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2019 | Completed final sign-off Oct 2019 | 1737 Sutter St | unit e. bathroom remodel in-kind. replacement of vanity and sink, shower tile, faucet, shower door and floor tile, all in-kind. (n) grab bars added at shower and toilet. all vent locations and (e) toilet to remain. no modifications to structuralDetails
unit e. bathroom remodel in-kind. replacement of vanity and sink, shower tile, faucet, shower door and floor tile, all in-kind. (n) grab bars added at shower and toilet. all vent locations and (e) toilet to remain. no modifications to structural | $20,000 |
| Sep 16, 2015 | Completed final sign-off Dec 2016 | 54 Thor Av | remodel of kitchen, living/dining room, bath,bedroom & new rear deck.new windows and doors on rear of house. deck and stairs less than 10' from grade. no work visible from street.Details
remodel of kitchen, living/dining room, bath,bedroom & new rear deck.new windows and doors on rear of house. deck and stairs less than 10' from grade. no work visible from street. | $100,000 |
| Aug 14, 2015 | Completed final sign-off Apr 2016 | 314 Los Palmos Dr | convert lower level storage area to conidtioned floor area including one bedroom & one bathroom, remove existing wood burning fireplace, no change to bldg footprint or envelope.Details
convert lower level storage area to conidtioned floor area including one bedroom & one bathroom, remove existing wood burning fireplace, no change to bldg footprint or envelope. | $80,000 |
| Sep 26, 2013 | Completed final sign-off Jan 2014 | 62 Wabash Tr | remodel existing bathroom - new toilet, vanity, shower, gfi and lighting circuits. lighting to comply with cec 150Details
remodel existing bathroom - new toilet, vanity, shower, gfi and lighting circuits. lighting to comply with cec 150 | $12,000 |
| Jul 11, 2013 | Completed final sign-off Jan 2014 | 568 Prentiss St | garage remodel - add bathroom & workroom in garage. reconfigure laundry area.Details
garage remodel - add bathroom & workroom in garage. reconfigure laundry area. | $40,000 |
| Oct 1, 2012 | Completed final sign-off Dec 2013 | 638 Guerrero St | demo of existing bathroom, bedroom, dining room, lath and plaster, bath, bedroom, dining, living room. replace 9 windows, front windows in kind.Details
demo of existing bathroom, bedroom, dining room, lath and plaster, bath, bedroom, dining, living room. replace 9 windows, front windows in kind. | $80,000 |
| Dec 7, 2011 | Completed final sign-off Mar 2012 | 95 Seward St | bathroom remodel, kitchen - new cabinets and counters. no change on walls and openings.Details
bathroom remodel, kitchen - new cabinets and counters. no change on walls and openings. | $45,000 |
| Sep 23, 2011 | Completed final sign-off Oct 2011 | 786 Minna St | revision to 201109194991. move non bearing partition to enlarge existing closet. relocate bathroom door per plan.Details
revision to 201109194991. move non bearing partition to enlarge existing closet. relocate bathroom door per plan. | |
| Sep 19, 2011 | Completed final sign-off Oct 2011 | 786 Minna St | unit #9: bathroom remodel reconfigure vanity, no structural work, 3 new light fixtures, no wall relocation, new lighting per cec (150k)Details
unit #9: bathroom remodel reconfigure vanity, no structural work, 3 new light fixtures, no wall relocation, new lighting per cec (150k) | $12,000 |
| Apr 13, 2011 | Completed final sign-off Jul 2011 | 786 Minna St | bathroom remodel, move laundry & walk in closet, per plans, non structural partition walls.Details
bathroom remodel, move laundry & walk in closet, per plans, non structural partition walls. | $30,000 |
| Mar 17, 2011 | Completed final sign-off Apr 2011 | 4760 17th St | bathroom remodel in ground floor unit 4760. new tub and shower, new toilet vanity, tile floor and shower surround. new fan, lights and gfci outlets.Details
bathroom remodel in ground floor unit 4760. new tub and shower, new toilet vanity, tile floor and shower surround. new fan, lights and gfci outlets. | $15,000 |
| Jun 30, 2009 | Completed final sign-off Oct 2009 | 1950 Monterey Bl | bathroom remodel tub walk in shower, toilet vanity tile on walls and floorDetails
bathroom remodel tub walk in shower, toilet vanity tile on walls and floor | $20,000 |
| Aug 28, 2006 | Expired or cancelled expired Jun 2010 | 54 Thor Av | remodel basement including bathroom. legalize basementDetails
remodel basement including bathroom. legalize basement | $38,000 |
| Oct 3, 2005 | Completed final sign-off Feb 2006 | 1950 Monterey Bl | remodel of (e) 1 master bathroom. remove (e) plumbing fixtures, replace with new build walk in tiled shower enclosure with hot mop shower pan. no walls removed.Details
remodel of (e) 1 master bathroom. remove (e) plumbing fixtures, replace with new build walk in tiled shower enclosure with hot mop shower pan. no walls removed. | $11,000 |