Back to bathroom remodel contractors
Travis Kappes Build Design & General Con
- Based in
- San Francisco
- On San Francisco permits
- Jun 2017 to Jan 2020
- Last 24 months
- 0 permits filed
10 permits since 2000: 5 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 394 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2017 | Completed final sign-off Mar 2019 | 1613 Church St | to comply w/nov #201781152 and #201775421. new horizontal expansion (in-fill basement,1st & 2nd lvl). 1st fl: adding bathroom, bedroom, study. 2nd fl: relocating kitchen and changing layout. new roof deck.Details
to comply w/nov #201781152 and #201775421. new horizontal expansion (in-fill basement,1st & 2nd lvl). 1st fl: adding bathroom, bedroom, study. 2nd fl: relocating kitchen and changing layout. new roof deck. | $30,000 |