Back to bathroom remodel contractors
Topview Construction Group Inc
- Based in
- Alameda
- On San Francisco permits
- Dec 2022 to Aug 2026
- Last 24 months
- 9 permits filed
13 permits since 2000: 8 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 2 in progress. Typically 0 days from filing to permit and 610 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2026 | In progress issued Aug 2026 | 3152 Lyon St | revision to pa 202605201616 put washer and dryer unit in bathroom; put kitchen sink on opposite wall. 3rd fl bathtub to showerDetails
revision to pa 202605201616 put washer and dryer unit in bathroom; put kitchen sink on opposite wall. 3rd fl bathtub to shower | |
| May 20, 2026 | In progress issued May 2026 | 3152 Lyon St | remodel of 2nd fl powder room and kitchen, 3rd fl bathrooms (2), removal and replacement of all (~30) windows, all work like for like, no change in plumbing fixture count, relocation of appliances, no wall demolition or construction.Details
remodel of 2nd fl powder room and kitchen, 3rd fl bathrooms (2), removal and replacement of all (~30) windows, all work like for like, no change in plumbing fixture count, relocation of appliances, no wall demolition or construction. | $30,000 |
| Dec 12, 2024 | Completed final sign-off Aug 2025 | 2338 Geary Bl | existing bathroom remodel in kind. (ref bpa: 2023.1106.0247)Details
existing bathroom remodel in kind. (ref bpa: 2023.1106.0247) | $7,000 |
| Nov 6, 2023 | Completed final sign-off Aug 2025 | 2338 Geary Bl | front bldg: rearrange interior layout to create new bedroom & 2 bathrooms, stall new electrical outlets & lighting fixtures, no exterior or structural workDetails
front bldg: rearrange interior layout to create new bedroom & 2 bathrooms, stall new electrical outlets & lighting fixtures, no exterior or structural work | $70,000 |
| Oct 13, 2023 | Completed final sign-off Aug 2025 | 100 Arleta Av | bathroom remodel including shower pan. tile kitchen cabinets. kitchen: only replace cabinets and countertop and light swicth. like for like. no moving or demo of walls.Details
bathroom remodel including shower pan. tile kitchen cabinets. kitchen: only replace cabinets and countertop and light swicth. like for like. no moving or demo of walls. | $20,000 |