Back to bathroom remodel contractors
Top To Bottom Renovation
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to Jun 2026
- Last 24 months
- 4 permits filed
50 permits since 2000: 38 completed, 3 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 5 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 16 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2020 | Completed final sign-off Aug 2022 | 1681 Hayes St | kitchen remodel. new full bathroom. new laundry and closet.Details
kitchen remodel. new full bathroom. new laundry and closet. | $120,000 |
| Nov 19, 2020 | Expired or cancelled expired Aug 2024 | 710 Cole St | remodel bathroom in-kind. replace tub work with shower.Details
remodel bathroom in-kind. replace tub work with shower. | $30,000 |
| Nov 12, 2020 | Completed final sign-off Jul 2021 | 224 Hermann St | master bath remodel, toilet, & vanity being moved - in kind. (no structural). no new wall & no existing wall relocation, new plumbing fixtures to remain at same location as existing. new lighting shall comply with cec 150.0(k)5.Details
master bath remodel, toilet, & vanity being moved - in kind. (no structural). no new wall & no existing wall relocation, new plumbing fixtures to remain at same location as existing. new lighting shall comply with cec 150.0(k)5. | $21,000 |
| Jun 14, 2019 | Completed final sign-off Jul 2019 | 545 Duncan St | remove existing tile around tub & wainscott & floor, install new shower valve, retile tub, wainscott & floor in bathroom.Details
remove existing tile around tub & wainscott & floor, install new shower valve, retile tub, wainscott & floor in bathroom. | $12,000 |
| May 3, 2018 | Completed final sign-off Apr 2019 | 533 Hill St | remove wall between living room and kitchen. replace extg rear deck door and provide new window at east living room wall. remodel interior hall with new trim, provide new walk in closet at bedroom, provide storage above bath.Details
remove wall between living room and kitchen. replace extg rear deck door and provide new window at east living room wall. remodel interior hall with new trim, provide new walk in closet at bedroom, provide storage above bath. | $25,000 |
| May 3, 2018 | Never finaled issued Feb 2019, no final | 6439 California St | change of use from limited use coffee shop/retail to non-formula retail restaurant at ground fl. interior remodel: new upgraded kitchen, new ada bathroom, relocate/new rear windows/doors.Details
change of use from limited use coffee shop/retail to non-formula retail restaurant at ground fl. interior remodel: new upgraded kitchen, new ada bathroom, relocate/new rear windows/doors. | $150,000 |
| Apr 11, 2018 | Completed final sign-off Feb 2019 | 533 Hill St | remodel kitchen, bath, new floors, sheetrock walls, repair damaged/rotted framing & siding; (in kind). all in unit 533bDetails
remodel kitchen, bath, new floors, sheetrock walls, repair damaged/rotted framing & siding; (in kind). all in unit 533b | $61,000 |
| Mar 14, 2018 | Completed final sign-off May 2019 | 1243 09th Av | unit #a, remodel in kind. re-rock walls, (3) bathrooms, (1) kitchen, new flooring. replace lightwell windows in kind. no structural work, no wall relocation or removal. comply w/ cec 150.0 (k) 3 & 150.0(k) 5 for skylights replacing. u factor shall be 0.55 or lessDetails
unit #a, remodel in kind. re-rock walls, (3) bathrooms, (1) kitchen, new flooring. replace lightwell windows in kind. no structural work, no wall relocation or removal. comply w/ cec 150.0 (k) 3 & 150.0(k) 5 for skylights replacing. u factor shall be 0.55 or less | $250,000 |
| Jan 18, 2017 | Completed final sign-off Apr 2017 | 60 Ora Wy | apt 203h: remodel kitchen & bathroom in-kind.Details
apt 203h: remodel kitchen & bathroom in-kind. | $40,000 |
| Jan 18, 2017 | Completed final sign-off Oct 2017 | 3251 Washington St | apt 5: remodel 2 bathrooms, kitchen & refinish flooring.Details
apt 5: remodel 2 bathrooms, kitchen & refinish flooring. | $150,000 |
| May 3, 2016 | Completed final sign-off Nov 2016 | 6441 California St | remodel extg kitchen and remodel extg bathroom. remodel and enlarge extg laundry room in corporating 1/2 bath.Details
remodel extg kitchen and remodel extg bathroom. remodel and enlarge extg laundry room in corporating 1/2 bath. | $150,000 |
| Jul 24, 2014 | Completed final sign-off Nov 2014 | 8400 Oceanview Tr | replace kitchen cabinets in-kind. replace entrycloset and laundry doors. replace vanity bath countertop.Details
replace kitchen cabinets in-kind. replace entrycloset and laundry doors. replace vanity bath countertop. | $20,000 |
| Aug 22, 2011 | Completed final sign-off Oct 2011 | 216 27th St | master bath remodel @ 2nd floor. no structural work and no new lighting. provide carbon monoxide detector & smoke detector.Details
master bath remodel @ 2nd floor. no structural work and no new lighting. provide carbon monoxide detector & smoke detector. | $30,000 |
| May 5, 2010 | Completed final sign-off Oct 2010 | 516 Noe St | demo existing bathroom to studs, move plumbing, elec, install lights, shower tile, lavi,toilet, tile floor, new door, window. no structuralDetails
demo existing bathroom to studs, move plumbing, elec, install lights, shower tile, lavi,toilet, tile floor, new door, window. no structural | $35,000 |
| Jul 17, 2009 | Completed final sign-off Nov 2009 | 27 Carson St | rev. o pa# 2009.06.02.9537 ( no plans). 2nd fl bath remodel. relocate hallway wall( non bearing) and vault ceiling & stair. install 2 windows at (e) openings/ lightwell not visible from street. add 1 new skylightDetails
rev. o pa# 2009.06.02.9537 ( no plans). 2nd fl bath remodel. relocate hallway wall( non bearing) and vault ceiling & stair. install 2 windows at (e) openings/ lightwell not visible from street. add 1 new skylight | $10,000 |
| Feb 18, 2009 | Completed final sign-off Jun 2009 | 700 Grand View Av | remove existing tub,shower, toilet, sink & tile foor,install new sheetrock tub, toilet, lavy, new door, tile bathroom floor. install fan/light, tile tub surroundDetails
remove existing tub,shower, toilet, sink & tile foor,install new sheetrock tub, toilet, lavy, new door, tile bathroom floor. install fan/light, tile tub surround | $18,000 |
| May 21, 2007 | Completed final sign-off Aug 2007 | 5080 Diamond Heights Bl | replace (e) 1 kitchen cabinets, countertops, plumbing, electrical. replace (e) guest. 1 bathroom toilet, sink, tub surround. replace 1 master bath (e) to toilet, sink shower stall . replace carpet with floating floor, paint walls.Details
replace (e) 1 kitchen cabinets, countertops, plumbing, electrical. replace (e) guest. 1 bathroom toilet, sink, tub surround. replace 1 master bath (e) to toilet, sink shower stall . replace carpet with floating floor, paint walls. | $30,000 |
| Nov 13, 2006 | Completed final sign-off May 2007 | 160 Corwin St | kitchen/bathroom remodel-replace old cabinets, sink, applances with new, replace old tub/shower, toilet, sink, with new, install new light fixtures & switches, install new wood flooring, flourescent lighting.Details
kitchen/bathroom remodel-replace old cabinets, sink, applances with new, replace old tub/shower, toilet, sink, with new, install new light fixtures & switches, install new wood flooring, flourescent lighting. | $25,000 |