Back to bathroom remodel contractors
Top Remodeling And Design Inc
- Based in
- Walnut Creek
- On San Francisco permits
- Nov 2024 to Nov 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 22, 2024 | Completed final sign-off May 2025 | 351 Buena Vista East Av | unit # 204e proposed plan removes wall left to the kitchen island. replace kitchen cabinetry & bathroom vanity. new flooring laid throughout home. bathroom shower walls will be replaced with (n) porcelain tile. fireplace wall will be tiledDetails
unit # 204e proposed plan removes wall left to the kitchen island. replace kitchen cabinetry & bathroom vanity. new flooring laid throughout home. bathroom shower walls will be replaced with (n) porcelain tile. fireplace wall will be tiled | $100,000 |