Back to bathroom remodel contractors
Top Construction
- Based in
- San Jose
- On San Francisco permits
- Mar 2016 to Feb 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 41 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2016 | Never finaled issued Jul 2016, no final | 3487 17th St | convert 525 sq ft of (e) storage into a bedroom and full bathroom & living room. extension of unit above sprinkler unit nad exit pasageway per nfpa 13r..Details
convert 525 sq ft of (e) storage into a bedroom and full bathroom & living room. extension of unit above sprinkler unit nad exit pasageway per nfpa 13r.. | $25,000 |
| Mar 30, 2016 | Completed final sign-off Jul 2016 | 3487 17th St | build new bathroom inside existing storage room. no new walls or space 2nd floor unit only.Details
build new bathroom inside existing storage room. no new walls or space 2nd floor unit only. | $7,000 |