Back to bathroom remodel contractors
Toolbox
- Based in
- San Francisco
- On San Francisco permits
- Jun 2002 to Apr 2026
- Last 24 months
- 2 permits filed
45 permits since 2000: 40 completed, 1 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 17 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2024 | Completed final sign-off Mar 2026 | 888 Haight St | structural: voluntary strengthen (e) post to beam connections at garage. architectural: at rear room behind garage - add (1) full bath, replace windows, insulate walls and add 5/8 type x gyp bd. w/ fire door to garage. this ground level rear room to be "unconditioned storage" not habitable space.Details
structural: voluntary strengthen (e) post to beam connections at garage. architectural: at rear room behind garage - add (1) full bath, replace windows, insulate walls and add 5/8 type x gyp bd. w/ fire door to garage. this ground level rear room to be "unconditioned storage" not habitable space. | $35,000 |
| Apr 19, 2021 | Never finaled issued Apr 2021, no final | 130 Winfield St | 1st fl (only) remove and replace wood paneling with 5/8 type x drywall, insulatem replace kitchen and bath fixtures and tile in-kind in (e) locations. upgrade wiring and lightng to code replace forced air heat and water heater with high effciency boiler and radiant heat. new flooring. no structuralDetails
1st fl (only) remove and replace wood paneling with 5/8 type x drywall, insulatem replace kitchen and bath fixtures and tile in-kind in (e) locations. upgrade wiring and lightng to code replace forced air heat and water heater with high effciency boiler and radiant heat. new flooring. no structural | $68,000 |
| Jul 23, 2019 | Completed final sign-off Jul 2020 | 782 11th Av | remodel lower unit (kitchen, new bath, 3 rear facing windows, 1 rear facing french door at deck, replace (e) windows at south prop line in (e) openings). remove (e) l level rotted porch & stairs at rear & construct new deck & stairs to grade. meps includedDetails
remodel lower unit (kitchen, new bath, 3 rear facing windows, 1 rear facing french door at deck, replace (e) windows at south prop line in (e) openings). remove (e) l level rotted porch & stairs at rear & construct new deck & stairs to grade. meps included | $120,000 |
| May 15, 2019 | Expired or cancelled cancelled Aug 2020 | 782 11th Av | one bathroom remodel upper unit. replace in kind tub, toilet, vanity, tile surfaces. non structuralDetails
one bathroom remodel upper unit. replace in kind tub, toilet, vanity, tile surfaces. non structural | $11,000 |
| Jan 24, 2019 | Completed final sign-off Aug 2019 | 56 Lower Tr | remodel kitchen and two bathrooms. new fixtures and finishes. new cabinetry and doors. replace in kind.Details
remodel kitchen and two bathrooms. new fixtures and finishes. new cabinetry and doors. replace in kind. | $48,000 |
| Sep 17, 2018 | Completed final sign-off Sep 2019 | 195 Jersey St | kitchen and bathroom remodel.Details
kitchen and bathroom remodel. | $38,000 |
| Apr 17, 2018 | Completed final sign-off Dec 2018 | 4339 26th St | replace finishes in (2) bathrooms, 1 shower pan replacement at 2nd floorDetails
replace finishes in (2) bathrooms, 1 shower pan replacement at 2nd floor | $42,000 |
| Apr 22, 2016 | Completed final sign-off Aug 2016 | 2401 Vallejo St | bathroom remodel (2/f) toilet & vanity (e) locations & plumbing, shower valve moves to new location, new shower pan, tile & shower enclosure (e) recessed lighting changed to led, bath fan replaced, new tile work.Details
bathroom remodel (2/f) toilet & vanity (e) locations & plumbing, shower valve moves to new location, new shower pan, tile & shower enclosure (e) recessed lighting changed to led, bath fan replaced, new tile work. | $20,000 |
| Nov 4, 2014 | Completed final sign-off Jan 2015 | 927 Grove St | remodel (e) bathroom- all ightings to be controlled via t-24 compliant occupancy senosr. all publumbing to be calgreen complaint; no work visible from street. no plans; to be comply with cec2150.0(k)5Details
remodel (e) bathroom- all ightings to be controlled via t-24 compliant occupancy senosr. all publumbing to be calgreen complaint; no work visible from street. no plans; to be comply with cec2150.0(k)5 | $9,037 |
| Sep 20, 2013 | Never finaled issued Sep 2013, no final | 1116 Fell St | convert pantry to a bathroom with a full shower. move door from kitchen to bedroom. one shower, 1 vanity , 2 sink, 1 toilet, 2 outlets, 2 ligh fixtures, 1 exhaust fan.Details
convert pantry to a bathroom with a full shower. move door from kitchen to bedroom. one shower, 1 vanity , 2 sink, 1 toilet, 2 outlets, 2 ligh fixtures, 1 exhaust fan. | $11,392 |
| Dec 19, 2012 | Completed final sign-off Mar 2015 | 421 Broderick St | demo of rear porch, new rear addition of bathroom & laundry in same footprint, bathroom renovation, front entry resequencing, wall removal at dining room, wall add for studyroom.Details
demo of rear porch, new rear addition of bathroom & laundry in same footprint, bathroom renovation, front entry resequencing, wall removal at dining room, wall add for studyroom. | $65,000 |
| Dec 19, 2012 | Completed final sign-off Mar 2015 | 419 Broderick St | demo of rear porch, new rear addition of bathroom & laundry in same footprint, new rear starir, new roof deck.Details
demo of rear porch, new rear addition of bathroom & laundry in same footprint, new rear starir, new roof deck. | $40,000 |
| Jan 4, 2012 | Completed final sign-off May 2012 | 3669 19th St | 1 kitchen and 1 bathroom remodel. replace existing fixtures and cabinetry.Details
1 kitchen and 1 bathroom remodel. replace existing fixtures and cabinetry. | $42,000 |
| Jul 13, 2011 | Completed final sign-off Oct 2011 | 5206 California St | interior removel of existing 3 story, 2 unit condo. 2 new baths, 1 at each of the 2 living stories, rear yard landscapingDetails
interior removel of existing 3 story, 2 unit condo. 2 new baths, 1 at each of the 2 living stories, rear yard landscaping | $25,000 |
| Mar 8, 2010 | Completed final sign-off Jun 2010 | 3044 Franklin St | remodel of bathroom new tile vanity, new shower pan, new shower enclosure. non-structural work, in-kind.Details
remodel of bathroom new tile vanity, new shower pan, new shower enclosure. non-structural work, in-kind. | $12,000 |
| Aug 28, 2009 | Completed final sign-off May 2010 | 419 Broderick St | remodel of interior for condo at 419 broderick: relocate kitchen, remodel bathroom, open structural wall between kitchen and dining, upgrade electrical in remodeled area, replace 6 existing windows with like kind wood, add 2 windows at(e) lightwell.Details
remodel of interior for condo at 419 broderick: relocate kitchen, remodel bathroom, open structural wall between kitchen and dining, upgrade electrical in remodeled area, replace 6 existing windows with like kind wood, add 2 windows at(e) lightwell. | $75,000 |
| Jun 18, 2009 | Completed final sign-off Jun 2010 | 39 Dashiell Hammett St | unit 401. demo existing master bath, replace vanity, tub and shower fixtures, new shower fan, new ventilation fan, replace door with pocket door in partition wall.Details
unit 401. demo existing master bath, replace vanity, tub and shower fixtures, new shower fan, new ventilation fan, replace door with pocket door in partition wall. | $20,000 |
| Jun 7, 2006 | Completed final sign-off Nov 2006 | 65 Santa Rita Av | remodel of existing bathrooms, relocation of non-loadbearing walls. addition & replacement of windows, modification of ceiling/roof structure. no change in exterior slope.Details
remodel of existing bathrooms, relocation of non-loadbearing walls. addition & replacement of windows, modification of ceiling/roof structure. no change in exterior slope. | $75,000 |
| Dec 14, 2005 | Completed final sign-off Apr 2006 | 746 Hayes St | bathroom remode - new sink, toilet, tub, tile, etc. windowDetails
bathroom remode - new sink, toilet, tub, tile, etc. window | $10,000 |
| Jan 20, 2004 | Completed final sign-off Apr 2004 | 5160 Diamond Heights Bl | remodel of existing bathroom new tub & fixtures. new tile & exhaust fan. unit c107 onlyDetails
remodel of existing bathroom new tub & fixtures. new tile & exhaust fan. unit c107 only | $8,000 |