Tony Vinh Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Apr 2021
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2021 | Completed final sign-off Jun 2021 | 455 Teresita Bl | install gas/ on ground level family room; install galvinized gas line from basement level; 2 family room; install ventalation pipes from gas furnace out rear wall of house.Details
install gas/ on ground level family room; install galvinized gas line from basement level; 2 family room; install ventalation pipes from gas furnace out rear wall of house. | $5,500 |
| Dec 5, 2013 | Completed final sign-off Sep 2014 | 1533 Newhall St | add (n) study room on basement per plan. add one (n) bedroom, one (n) family room, remodel (e) bathroom and remove (e) powder room on 1st floor per plan.Details
add (n) study room on basement per plan. add one (n) bedroom, one (n) family room, remodel (e) bathroom and remove (e) powder room on 1st floor per plan. | $45,000 |