Tom Minka
- Based in
- San Rafael
- On San Francisco permits
- Mar 2010 to Apr 2026
- Last 24 months
- 3 permits filed
17 permits since 2000: 14 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2026 | Completed final sign-off Apr 2026 | 2151 39th Av | partial remodel of bathroom: replace cabinets, remove whirpool tub and replace with corian pan, relocate light, fan, switch and outlet.Details
partial remodel of bathroom: replace cabinets, remove whirpool tub and replace with corian pan, relocate light, fan, switch and outlet. | $35,000 |
| Jun 17, 2024 | Completed final sign-off Jan 2025 | 1385 20th Av | unit #4:bathroom, kitchen remodel, change shower valve, install new tub, new kitchen cabinets, relocate gas shut off for ranges. update electrical from fuse to breakers, relocate from closet to kitchen wall, add can lighting, add circut per code for appliances, lights, outlets etc. change window inDetails
unit #4:bathroom, kitchen remodel, change shower valve, install new tub, new kitchen cabinets, relocate gas shut off for ranges. update electrical from fuse to breakers, relocate from closet to kitchen wall, add can lighting, add circut per code for appliances, lights, outlets etc. change window in | $38,500 |
| Oct 28, 2020 | Completed final sign-off Jan 2021 | 3474 Pierce St | in-kind kitchen remodel, new cabinets, applicances and countertops. new bathroom, vanity and top with new facuet and 1.28gpf toilet. rough plumbing and move wall switch and add 1 outlet.Details
in-kind kitchen remodel, new cabinets, applicances and countertops. new bathroom, vanity and top with new facuet and 1.28gpf toilet. rough plumbing and move wall switch and add 1 outlet. | $25,000 |
| Oct 5, 2020 | Completed final sign-off Dec 2020 | 3476 Pierce St | in kind bathroom remodel. new shower valve, tub, shower walls, vanity, toilet. upgradce elec with dedicated 20 amp panel, in kind kitchen remodel change gountertops and appliancesDetails
in kind bathroom remodel. new shower valve, tub, shower walls, vanity, toilet. upgradce elec with dedicated 20 amp panel, in kind kitchen remodel change gountertops and appliances | $25,000 |
| Aug 14, 2019 | Completed final sign-off Oct 2023 | 205 Juanita Wy | voluntary hold downs, shearwall, 5/8" type x fire rock & fire type; in-kind kitchen (100 sq.ft.) & (2) bathrooms (35 sq.ft. & 25 sq.ft.). less than 50% deck, 18" above gradeDetails
voluntary hold downs, shearwall, 5/8" type x fire rock & fire type; in-kind kitchen (100 sq.ft.) & (2) bathrooms (35 sq.ft. & 25 sq.ft.). less than 50% deck, 18" above grade | $120,000 |
| Aug 14, 2019 | Completed final sign-off Feb 2020 | 1385 20th Av | unit 2: remodel kitchen & bathroom, move gas line to accommodate range, new cabinets, flooring, fixtures; move electrical panel; add additional cabinets to code. no structural framing.Details
unit 2: remodel kitchen & bathroom, move gas line to accommodate range, new cabinets, flooring, fixtures; move electrical panel; add additional cabinets to code. no structural framing. | $20,000 |
| Aug 15, 2018 | Completed final sign-off Nov 2018 | 2290 North Point St | unit#102. partial bath remodel, no change in wall & opening layout. remove (e) shower wall, floor curb, valve repair. tile floor & walls, prepitch shower walls, w/ vapor barrier, cement board, red gourd, deckmud & tile floor w/ 2x2 tile set new drain 2". n/a for maher.Details
unit#102. partial bath remodel, no change in wall & opening layout. remove (e) shower wall, floor curb, valve repair. tile floor & walls, prepitch shower walls, w/ vapor barrier, cement board, red gourd, deckmud & tile floor w/ 2x2 tile set new drain 2". n/a for maher. | $11,500 |
| Oct 7, 2014 | Completed final sign-off Dec 2014 | 2301 Larkin St | work in unit 404:partial bath remodel, remove (e) shower valve and floor, remove (e) shower window. install new fixtures shower valve, new drain, pour new pan anbd install new shower tile. prepare shower walls w/ vapor barrier, dura rock redguard, pour pan and tile. kDetails
work in unit 404:partial bath remodel, remove (e) shower valve and floor, remove (e) shower window. install new fixtures shower valve, new drain, pour new pan anbd install new shower tile. prepare shower walls w/ vapor barrier, dura rock redguard, pour pan and tile. k | $19,551 |
| Mar 24, 2010 | Completed final sign-off Jun 2010 | 766 12th Av | bathroom remodel. change tub with 5' shower pan. add toilet, new pressure shower controls, new pedestal sinkk & faucet, new cabinet, tile floor. new he fluorescent cans, solar tube, fan & lights combo. install pocket doors and replace 2 windows not visible from street. add corner sink in existingDetails
bathroom remodel. change tub with 5' shower pan. add toilet, new pressure shower controls, new pedestal sinkk & faucet, new cabinet, tile floor. new he fluorescent cans, solar tube, fan & lights combo. install pocket doors and replace 2 windows not visible from street. add corner sink in existing | $31,000 |