Back to bathroom remodel contractors
Together Home Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Nov 2025 to Aug 2026
- Last 24 months
- 10 permits filed
10 permits since 2000: 5 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 2 completed, 3 in progress. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2026 | In progress issued Aug 2026 | 1378 Waller St | in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s). | $74,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 2111 Hyde St | complete bath remodel including updates of all plumbing and electrical, shower pan enlargement, entry doorway to bathroom replacement same size same location. all work in kind.Details
complete bath remodel including updates of all plumbing and electrical, shower pan enlargement, entry doorway to bathroom replacement same size same location. all work in kind. | $24,000 |
| May 1, 2026 | In progress issued May 2026 | 1735 28th Av | kitchen & master bath:remove & replace all fixtures, new layout per structural. new lighting, areas of remodel & living room per plans. master bedroom: new opening per drawings. lighting up to 9 new lights on living room.Details
kitchen & master bath:remove & replace all fixtures, new layout per structural. new lighting, areas of remodel & living room per plans. master bedroom: new opening per drawings. lighting up to 9 new lights on living room. | $80,000 |
| Mar 4, 2026 | Completed final sign-off Jun 2026 | 514 48th Av | in-kind remodeling of 1 bathroom(s) in basement with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in basement with 1 shower pan(s). | $45,500 |
| Jan 15, 2026 | Completed final sign-off Apr 2026 | 167 Somerset St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). alteration of service equipment. | $27,000 |