Back to bathroom remodel contractors
Tn Building
- Based in
- San Francisco
- On San Francisco permits
- Jun 2012 to Jun 2026
- Last 24 months
- 12 permits filed
59 permits since 2000: 51 completed, 3 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 in progress. Typically 8 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2025 | Completed final sign-off Aug 2025 | 427 16th Av | remodel (e) kitchen, powder/laundry room. demo (e) bay window & replace w/door. new rear yard deck & stairs. (e) windows replace in kind. new master bath & closet. remodel (e) bath & skylight. voluntary seismic retrofitDetails
remodel (e) kitchen, powder/laundry room. demo (e) bay window & replace w/door. new rear yard deck & stairs. (e) windows replace in kind. new master bath & closet. remodel (e) bath & skylight. voluntary seismic retrofit | $210,000 |
| Dec 10, 2024 | Completed final sign-off Mar 2025 | 75 Marcela Av | remodel existing bathroom, all fixtures stay in the same location. no walls move.Details
remodel existing bathroom, all fixtures stay in the same location. no walls move. | $30,000 |
| Nov 27, 2024 | Completed final sign-off Aug 2025 | 427 16th Av | single family residence. garage level: lower existing foundation to new ceiling height of 8 feet, new stair connecting to level, new bedroom, new bath, new family room, new electrical level 1: new stair connecting to level 1. no change in unit count.Details
single family residence. garage level: lower existing foundation to new ceiling height of 8 feet, new stair connecting to level, new bedroom, new bath, new family room, new electrical level 1: new stair connecting to level 1. no change in unit count. | $210,000 |
| Apr 3, 2024 | In progress issued Apr 2024 | 2137 Beach St | remodel 2 bathrooms layout not changedDetails
remodel 2 bathrooms layout not changed | $35,000 |
| Jan 10, 2020 | Completed final sign-off Jun 2020 | 1071 Clayton St | replace two windows at front of building. bedroom window will be double casement with fixed center panel - aluminum clad wood windows. bathroom window wiil have a center divide - glass block. dryrot repair around windowsDetails
replace two windows at front of building. bedroom window will be double casement with fixed center panel - aluminum clad wood windows. bathroom window wiil have a center divide - glass block. dryrot repair around windows | $20,000 |
| Nov 21, 2019 | Completed final sign-off Jun 2020 | 1071 Clayton St | remodel e kitchen, remodel e master bath, add new full bath, 2 new windows at rear of building, new elec light fixturesDetails
remodel e kitchen, remodel e master bath, add new full bath, 2 new windows at rear of building, new elec light fixtures | $110,000 |
| Mar 1, 2019 | Completed final sign-off Sep 2020 | 19 Topaz Wy | remodel kitchen & 3 baths no structural partition demoDetails
remodel kitchen & 3 baths no structural partition demo | $40,000 |
| Jun 15, 2017 | Completed final sign-off Jun 2018 | 255 Connecticut St | 00entire interior remodel of both units. relocate walls, interior stairs, cabinets tile paint. unit 255: relocate kitchen, add master bath, unit 257: remodel kitchen, remodel baths, add laundry; window replacement in-kind in 255/257Details
00entire interior remodel of both units. relocate walls, interior stairs, cabinets tile paint. unit 255: relocate kitchen, add master bath, unit 257: remodel kitchen, remodel baths, add laundry; window replacement in-kind in 255/257 | $200,000 |
| Feb 15, 2017 | Completed final sign-off May 2017 | 25 Hattie St | remodel bathroom, replace sheetrock & insulation as a result of fire damage. repair siding damaged by fire, south side of bldg.Details
remodel bathroom, replace sheetrock & insulation as a result of fire damage. repair siding damaged by fire, south side of bldg. | $70,000 |
| May 27, 2016 | Completed final sign-off Sep 2016 | 40 Genebern Wy | excavate crawl space to create bedroom at garage level. relocate furnance and water heater. 2 new windows. legalize bathroomDetails
excavate crawl space to create bedroom at garage level. relocate furnance and water heater. 2 new windows. legalize bathroom | $150,000 |
| Jan 25, 2016 | Completed final sign-off Mar 2016 | 1218 02nd Av | kitchen and bathroom remodel - all fixtures stay in same locations. no structural work.Details
kitchen and bathroom remodel - all fixtures stay in same locations. no structural work. | $25,000 |
| Sep 9, 2015 | Completed final sign-off Jan 2020 | 3130 Webster St | add 1 unit include bedroom, bathroom, kitchen, closet, living room, per ordinance# 30-15. relocate (e) laundry. relocate (e) bike storage.Details
add 1 unit include bedroom, bathroom, kitchen, closet, living room, per ordinance# 30-15. relocate (e) laundry. relocate (e) bike storage. | $85,000 |
| Nov 10, 2014 | Completed final sign-off Jan 2015 | 2460 Larkin St | kitchen and 2 bathroom remodel. no walls moved,removed, or added. all fixture and appliances layouts to remain unchanged.Details
kitchen and 2 bathroom remodel. no walls moved,removed, or added. all fixture and appliances layouts to remain unchanged. | $46,000 |
| Jan 22, 2014 | Completed final sign-off Feb 2016 | 3337 Broderick St | vertical addition of new 3rd story & roof deck on 4th level. new stair, bath remodel & structural connections & shear walls on 2nd story. basement level concrete & moment frames & shearwalls completed under previous permit. ** maher: compliance with ordinance no# 155-13 not required. **Details
vertical addition of new 3rd story & roof deck on 4th level. new stair, bath remodel & structural connections & shear walls on 2nd story. basement level concrete & moment frames & shearwalls completed under previous permit. ** maher: compliance with ordinance no# 155-13 not required. ** | $150,000 |