Titus Maintenance & Installation Service

Contractor license
872945
State license record
Based in
Danville
On San Francisco permits
Jun 2021 to Jun 2021
Last 24 months
0 permits filed

1 permit since 2000: 1 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Jun 4, 2021Completed
final sign-off Dec 2021
501 Tunnel Avinstall an integreated material recovery facility (imrf) for recology. the imrf design will included but not limit to erection of new recycling facility. no structural work to the (e) building. no modifications to building equipment install on existing plant.
Details
Permit
202106041700
Status
complete
Filed
Jun 4, 2021
Permit issued
Aug 5, 2021
Final sign-off
Dec 7, 2021
Declared cost
$800,000
Address
501 Tunnel Av

install an integreated material recovery facility (imrf) for recology. the imrf design will included but not limit to erection of new recycling facility. no structural work to the (e) building. no modifications to building equipment install on existing plant.

Open the permit page

$800,000