Back to bathroom remodel contractors
Timothy Perry
- Based in
- Montara
- On San Francisco permits
- May 2000 to Sep 2025
- Last 24 months
- 1 permit filed
16 permits since 2000: 12 completed, 4 never finaled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 never finaled. Typically 0 days from filing to permit and 71 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2025 | Completed final sign-off May 2026 | 1 Hawthorne St | kitchen remodel, 2 bath remodel. cabinets, appliances, counters, lighting, flooring. bath tile, vanity bases, vanity tops and faucets. flooring added lights. no removal of walls. existing accessible features to be maintainedDetails
kitchen remodel, 2 bath remodel. cabinets, appliances, counters, lighting, flooring. bath tile, vanity bases, vanity tops and faucets. flooring added lights. no removal of walls. existing accessible features to be maintained | $100,000 |
| Dec 22, 2020 | Completed final sign-off May 2021 | 1425 Vallejo St | unit 303. bathroom remodel - shower, tile, vanity, sink, added lighting, paint and new floor.Details
unit 303. bathroom remodel - shower, tile, vanity, sink, added lighting, paint and new floor. | $22,000 |
| Nov 19, 2018 | Never finaled issued Nov 2018, no final | 925 Corbett Av | #204: remodel kitchen, master bath & guest bath.Details
#204: remodel kitchen, master bath & guest bath. | $70,000 |
| Feb 1, 2018 | Never finaled issued Feb 2018, no final | 925 Corbett Av | kitchen remodel new counters and cabinets, sink facuet plum to remain in same place. move ele panel. upgrade to 8 circuits (7 in kitchen). renovate (2) bathrooms. tile and vanity shower pan premade. remove kitchen wall, paint unit & upgrade closets. recess lighting in kitchen, hallwya and living rmDetails
kitchen remodel new counters and cabinets, sink facuet plum to remain in same place. move ele panel. upgrade to 8 circuits (7 in kitchen). renovate (2) bathrooms. tile and vanity shower pan premade. remove kitchen wall, paint unit & upgrade closets. recess lighting in kitchen, hallwya and living rm | $85,000 |
| Mar 14, 2013 | Completed final sign-off May 2013 | 3934 Clay St | remodel bathroom, new tile, fixtures, paint, mirror, toilet, vanity base, shower glass, sink & tub.Details
remodel bathroom, new tile, fixtures, paint, mirror, toilet, vanity base, shower glass, sink & tub. | $25,000 |
| Feb 1, 2011 | Completed final sign-off Apr 2011 | 29 Villa Tr | bathroom remodel to enlarge bathroom. replace tile, sink, lights, tile floor, paint. new flooring bedroomDetails
bathroom remodel to enlarge bathroom. replace tile, sink, lights, tile floor, paint. new flooring bedroom | $10,000 |
| Dec 8, 2005 | Completed final sign-off Feb 2006 | 29 Villa Tr | remodel and enlarge existing kitchen remove existing powder room half bath relocate existing pantry remove portion of non bearing interior wallDetails
remodel and enlarge existing kitchen remove existing powder room half bath relocate existing pantry remove portion of non bearing interior wall | $35,000 |