Tim T. Jones Construction
- Based in
- San Rafael
- On San Francisco permits
- Dec 2001 to Nov 2005
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2005 | Never finaled issued Nov 2005, no final | 2595 28th Av | install exterior landing with 3 steps at rear of exit of garage. landing size 3'6 x 4'. 1 step down to landingDetails
install exterior landing with 3 steps at rear of exit of garage. landing size 3'6 x 4'. 1 step down to landing | $500 |
| Aug 26, 2005 | Completed final sign-off Dec 2005 | 2595 28th Av | repair damage in south west wall,new kitchen cabinets,new tile in bathroom,electrical upgrade.Details
repair damage in south west wall,new kitchen cabinets,new tile in bathroom,electrical upgrade. | $50,000 |
| Dec 13, 2001 | Completed final sign-off Feb 2002 | 3125 Washington St | remove all damaged material and replace w(n) including deckDetails
remove all damaged material and replace w(n) including deck | $6,800 |