Tim Harrington Electrical
- Based in
- San Bruno
- On San Francisco permits
- Feb 2007 to Jun 2007
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2007 | Never finaled issued Jun 2007, no final | 151 Mendell St | as built changes to 200702013135. mreove monitoring of piv, relocate water flow switchesDetails
as built changes to 200702013135. mreove monitoring of piv, relocate water flow switches | $100 |
| Feb 1, 2007 | Expired or cancelled expired May 2008 | 151 Mendell St | replace fire alarm system for entire building: 3 smoke detectors, 3 duct smoke detectors, 4 monitor module, 2 batteries, 6 manual pulls, 1 fire alarm panel, 16 horn strobes, 29 strobes.Details
replace fire alarm system for entire building: 3 smoke detectors, 3 duct smoke detectors, 4 monitor module, 2 batteries, 6 manual pulls, 1 fire alarm panel, 16 horn strobes, 29 strobes. | $57,000 |