Tikal Construction
- Based in
- Richmond
- On San Francisco permits
- Feb 2022 to Jul 2023
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2023 | Completed final sign-off Apr 2024 | 2681 Sutter St | rev pa202304266476: new foundation/footing per c/n issued by bid to a front staircase replacement (202304266476) due to dry rot.Details
rev pa202304266476: new foundation/footing per c/n issued by bid to a front staircase replacement (202304266476) due to dry rot. | $2,000 |
| May 24, 2023 | Completed final sign-off Aug 2023 | 105 Robinhood Dr | rev to pa 20220225869: required structural change as noted for new post and signed by strutural engineer.Details
rev to pa 20220225869: required structural change as noted for new post and signed by strutural engineer. | |
| Apr 26, 2023 | Completed final sign-off Apr 2024 | 2681 Sutter St | +repair and replace (e) stair case (facing street). to match existing.Details
+repair and replace (e) stair case (facing street). to match existing. | $10,000 |
| Jul 25, 2022 | Completed final sign-off Aug 2023 | 105 Robinhood Dr | revision to pa# 202202258696. 3 bathrooms, 1 kitchen remodeling. orig 2 bath, 1 kitchen. non structural.Details
revision to pa# 202202258696. 3 bathrooms, 1 kitchen remodeling. orig 2 bath, 1 kitchen. non structural. | $100,000 |
| Feb 25, 2022 | Completed final sign-off Aug 2023 | 105 Robinhood Dr | demo kitchen, replace hardwood floors, move plumbing and gas replace cabinets, update electrical, install range hood, dishwasher and microwave drawer. demo bathroom 1, close window opening, replace vanity and fixtures. demo bathroom 2, install vanity and fixtures, replace windows (non street facing)Details
demo kitchen, replace hardwood floors, move plumbing and gas replace cabinets, update electrical, install range hood, dishwasher and microwave drawer. demo bathroom 1, close window opening, replace vanity and fixtures. demo bathroom 2, install vanity and fixtures, replace windows (non street facing) | $50,000 |