Thynne Home Repairs
- Based in
- Albany
- On San Francisco permits
- Sep 2007 to Sep 2007
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2007 | Completed final sign-off Oct 2007 | 120 Karen Ct | rebuild existing deck at rear of building. sister new pressure treated joists to existing. replace rim joist, and install new decking material. replace redwood railing at 42" high in kind.Details
rebuild existing deck at rear of building. sister new pressure treated joists to existing. replace rim joist, and install new decking material. replace redwood railing at 42" high in kind. | $2,500 |