Back to bathroom remodel contractors
Throne Builders Inc
- Based in
- Elk Grove
- On San Francisco permits
- Jul 2012 to Oct 2016
- Last 24 months
- 0 permits filed
34 permits since 2000: 32 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 0 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 5, 2016 | Completed final sign-off Nov 2016 | 2663 18th Av | new bedroom, new full bathroom, new media room on level 1 ( first floor).Details
new bedroom, new full bathroom, new media room on level 1 ( first floor). | $20,000 |
| Apr 11, 2016 | Completed final sign-off Aug 2016 | 739 48th Av | revision to pa#201601257929. work to include structural beam and post replacement at existing wall. reconfigure ground floor masterbedroom and bathroom.Details
revision to pa#201601257929. work to include structural beam and post replacement at existing wall. reconfigure ground floor masterbedroom and bathroom. | $60,000 |
| Jan 25, 2016 | Completed final sign-off Jul 2016 | 739 48th Av | interior remodeling , kitchen & 2 bathrooms no wal removals ,door & window replacement.Details
interior remodeling , kitchen & 2 bathrooms no wal removals ,door & window replacement. | $60,000 |
| Dec 23, 2015 | Completed final sign-off Apr 2016 | 539 Munich St | bathroom remodel 2nd floor. new tub valve toilet vanityDetails
bathroom remodel 2nd floor. new tub valve toilet vanity | $8,000 |
| Nov 16, 2015 | Completed final sign-off Apr 2016 | 1026 Castro St | kitchen/bathroom remnodel in-kind; new cabinets, sink, faucet, new led lights, outlets, new shower valve. all fixtures same location, no floorplan/wall relocation.Details
kitchen/bathroom remnodel in-kind; new cabinets, sink, faucet, new led lights, outlets, new shower valve. all fixtures same location, no floorplan/wall relocation. | $24,000 |
| Jul 22, 2015 | Completed final sign-off May 2016 | 539 Munich St | 1/f remodel: new livable space study room, family rm, full bathroom & bar sink (new area approx 722 sq ft), relocate duckt work, laundry rm & mech equip. 2/f: update (e) stairs to code, install (n) cable railing system, increase size of (e) openings. struc/plbg/mech/elec as req/indicated.Details
1/f remodel: new livable space study room, family rm, full bathroom & bar sink (new area approx 722 sq ft), relocate duckt work, laundry rm & mech equip. 2/f: update (e) stairs to code, install (n) cable railing system, increase size of (e) openings. struc/plbg/mech/elec as req/indicated. | $84,000 |
| Jul 13, 2015 | Completed final sign-off Feb 2019 | 1331 San Bruno Av | horizontal & vertical addition. replace foundation, bring front & rear facades level, more front steps. change windows & doors. add 3rd story @ back at the house. add decks in back 2nd story & front 3rd story. add bathroom 3rd story.Details
horizontal & vertical addition. replace foundation, bring front & rear facades level, more front steps. change windows & doors. add 3rd story @ back at the house. add decks in back 2nd story & front 3rd story. add bathroom 3rd story. | $600,000 |
| Jul 2, 2015 | Completed final sign-off Aug 2015 | 1391 18th Av | remodel kitchen & 2 bathrooms. no change on walls.Details
remodel kitchen & 2 bathrooms. no change on walls. | $25,000 |
| May 27, 2015 | Completed final sign-off Apr 2016 | 872 Kansas St | to add a new unit at basement level, convert half bath to full bath. add new kitchen and relocate laundry room. 1st floor unit: add a new deck 10'-5"x9"-0" at rear.Details
to add a new unit at basement level, convert half bath to full bath. add new kitchen and relocate laundry room. 1st floor unit: add a new deck 10'-5"x9"-0" at rear. | $35,000 |
| Feb 10, 2015 | Completed final sign-off Mar 2015 | 567 27th St | bathroom remodel: tub, toilet, vanity, replacement in existing location, new ceiling fan, tile.Details
bathroom remodel: tub, toilet, vanity, replacement in existing location, new ceiling fan, tile. | $10,000 |
| Nov 19, 2013 | Completed final sign-off Aug 2015 | 1001 Ashbury St | interior demolition, kitchen & bathroom remodel, no change on walls.Details
interior demolition, kitchen & bathroom remodel, no change on walls. | $8,000 |
| Aug 15, 2013 | Completed final sign-off Dec 2013 | 326 Pierce St | apt #1: bathroom remodel, and dry rot repair, plumbing and electrical to be pulled by licensed sub contractorsDetails
apt #1: bathroom remodel, and dry rot repair, plumbing and electrical to be pulled by licensed sub contractors | $5,000 |