Thomas Design Construction
- Based in
- Sausalito
- On San Francisco permits
- Jul 2006 to Nov 2023
- Last 24 months
- 0 permits filed
5 permits since 2000: 2 completed, 1 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 in progress. Typically 247 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 6, 2023 | In progress issued Jul 2024 | 570 Belvedere St | interior remodel of level 1 kitchen, level 2 master bedroom and level 2 shared bathroom. 45sf addition to master bedroom. new master bedroom added. deck and master bedroom roof at rear. exterior renovations include dedmo and replacement of windows, doors, deck, and master bedroom.Details
interior remodel of level 1 kitchen, level 2 master bedroom and level 2 shared bathroom. 45sf addition to master bedroom. new master bedroom added. deck and master bedroom roof at rear. exterior renovations include dedmo and replacement of windows, doors, deck, and master bedroom. | $450,000 |