Back to bathroom remodel contractors
Thomas Construction
- Based in
- Brisbane
- On San Francisco permits
- Feb 2003 to Jun 2018
- Last 24 months
- 0 permits filed
12 permits since 2000: 8 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 109 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2010 | Completed final sign-off Feb 2011 | 605 Elizabeth St | add a new bathroom addition atop an (e) 2-story bump-out @ rear of bldg. enclose ground level of bump-out. remodel (e) bathrooms. add fire rated window w/ obscured glass @ east property line, add skylight.Details
add a new bathroom addition atop an (e) 2-story bump-out @ rear of bldg. enclose ground level of bump-out. remodel (e) bathrooms. add fire rated window w/ obscured glass @ east property line, add skylight. | $68,000 |