Back to bathroom remodel contractors
Thomas Chen Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2009 to May 2026
- Last 24 months
- 4 permits filed
39 permits since 2000: 38 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 20 completed, 1 never finaled. Typically 0 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2026 | Completed final sign-off Aug 2026 | 2235 30th Av | bathroom remodel, tub to tub, wall tiles, floor tiles, vanity, toilet.Details
bathroom remodel, tub to tub, wall tiles, floor tiles, vanity, toilet. | $8,500 |
| Oct 18, 2024 | Completed final sign-off May 2025 | 553 34th Av | 1. (2) bathroom remodel: replace drywall, wall tiles and floor tiles. 2. kitchen remodel: replace drywalls, counter top,cabinets and tiles. 3. replace 5 windows at the lightwellDetails
1. (2) bathroom remodel: replace drywall, wall tiles and floor tiles. 2. kitchen remodel: replace drywalls, counter top,cabinets and tiles. 3. replace 5 windows at the lightwell | $32,000 |
| Apr 4, 2023 | Completed final sign-off Jan 2025 | 1745 Silliman St | replace e fixtures in kitchen & bathroom on 2nd flr, add a new full bath on ground flr.Details
replace e fixtures in kitchen & bathroom on 2nd flr, add a new full bath on ground flr. | $45,000 |
| Oct 19, 2022 | Completed final sign-off Mar 2023 | 2429 Clement St | unit #1 & #3. kitchen remodel: replace cabinets, counter top, drywalls. bathroom remodel: replace floor tiles, wall tiles & window in bathroomDetails
unit #1 & #3. kitchen remodel: replace cabinets, counter top, drywalls. bathroom remodel: replace floor tiles, wall tiles & window in bathroom | $21,500 |
| Jan 25, 2022 | Completed final sign-off Aug 2022 | 1745 Sanchez St | 1745a sanchez st: non structural, remodel one kitchen: replace cabinets, floor tiles, drywall. remodel one bathroom: replace shower tiles, vanity, drwall, floor tiles. replace 10 windows non-street facing in same location, no size changes.Details
1745a sanchez st: non structural, remodel one kitchen: replace cabinets, floor tiles, drywall. remodel one bathroom: replace shower tiles, vanity, drwall, floor tiles. replace 10 windows non-street facing in same location, no size changes. | $19,000 |
| Jun 25, 2021 | Completed final sign-off Mar 2022 | 143 San Pablo Av | bathroom remodel - replace floor tiles, wall tiles, vanity, a window, a skylight, and doorsDetails
bathroom remodel - replace floor tiles, wall tiles, vanity, a window, a skylight, and doors | $15,000 |
| Feb 5, 2019 | Completed final sign-off Jul 2019 | 165 Noe St | unit 165b: replace kitchen cabinets counter tops, drywalls and a window at the rear. remove terra cotta flue pipes in the kitchen, replace bathroom vanity and vanity top, tiles and drywall.Details
unit 165b: replace kitchen cabinets counter tops, drywalls and a window at the rear. remove terra cotta flue pipes in the kitchen, replace bathroom vanity and vanity top, tiles and drywall. | $25,000 |
| Nov 8, 2016 | Completed final sign-off Jun 2017 | 315 19th Av | kitchen and bathroom remodel - replace kitchen cabinets, floor tiles, backsplash, drywall; replace bathroom tiles, vanity, dry wall, bathtub. replace three windows in the back.Details
kitchen and bathroom remodel - replace kitchen cabinets, floor tiles, backsplash, drywall; replace bathroom tiles, vanity, dry wall, bathtub. replace three windows in the back. | $28,000 |
| Jul 5, 2016 | Completed final sign-off Mar 2017 | 176 09th Av | kitchen & bathroom remodel; replace kitchen cabinets, floor tiles, backsplash, drywalls; replace bathroom bathtub, toilet, tiles, vanity, drywall.Details
kitchen & bathroom remodel; replace kitchen cabinets, floor tiles, backsplash, drywalls; replace bathroom bathtub, toilet, tiles, vanity, drywall. | $31,000 |
| Dec 4, 2014 | Completed final sign-off May 2015 | 220 Cresta Vista Dr | kitchen and bathroom remodel. replace kitchen cabinets, tiles, drywall and counter top. replace bathroom window, tiles and drywalls. vinyl windows - u factor shall not exceed 0.32Details
kitchen and bathroom remodel. replace kitchen cabinets, tiles, drywall and counter top. replace bathroom window, tiles and drywalls. vinyl windows - u factor shall not exceed 0.32 | $23,500 |
| Jun 25, 2014 | Completed final sign-off Dec 2014 | 2107 Jones St | kitchen and bathroom remodel: install kitchen cabinets, tiles and drywalls, install bathroom tiles and drywalls, patch plaster in the hallway and bedrooms, replace 10 windows in back of the buildingDetails
kitchen and bathroom remodel: install kitchen cabinets, tiles and drywalls, install bathroom tiles and drywalls, patch plaster in the hallway and bedrooms, replace 10 windows in back of the building | $19,800 |
| Dec 17, 2013 | Completed final sign-off Jul 2014 | 1837 Powell St | kitchen, bath, and toilet room remodel. comply with complaint 201343131. kitchen: remove and replace drywall and cabinets. bath and toilet room: remove and replace drywall,tile,bathtub, vanity. patch plaster in the bedrooms and hallDetails
kitchen, bath, and toilet room remodel. comply with complaint 201343131. kitchen: remove and replace drywall and cabinets. bath and toilet room: remove and replace drywall,tile,bathtub, vanity. patch plaster in the bedrooms and hall | $19,000 |
| Dec 17, 2013 | Completed final sign-off Jul 2014 | 1835 Powell St | kitchen, bath, toilet room remodel to comply with 201343131. kitchen: remove and replace drywall and cabinets. bath and toilet room: remove and replace drywall,tile, bathtub and vanity. patch plaster in bedrooms and hallDetails
kitchen, bath, toilet room remodel to comply with 201343131. kitchen: remove and replace drywall and cabinets. bath and toilet room: remove and replace drywall,tile, bathtub and vanity. patch plaster in bedrooms and hall | $19,000 |
| Jul 9, 2013 | Completed final sign-off Oct 2013 | 100 Ulloa St | master bathroom and family bathroom remodel. replace wall tiles, floor tiles, drywalls, vanity, bathtub, two recessed lights and mideicine cabinet lights.Details
master bathroom and family bathroom remodel. replace wall tiles, floor tiles, drywalls, vanity, bathtub, two recessed lights and mideicine cabinet lights. | $12,000 |
| Jul 2, 2013 | Never finaled issued Jul 2013, no final | 710 Moraga St | unit #d :kitchen remodel:strip off walls and ceiling. install tiles, drywall, cabinets (8'x10') replace inkind for same fire rated assebly. bathroom remodel:strip off walls and ceiling. install tiles, bathtub, and vanity. (5x8)Details
unit #d :kitchen remodel:strip off walls and ceiling. install tiles, drywall, cabinets (8'x10') replace inkind for same fire rated assebly. bathroom remodel:strip off walls and ceiling. install tiles, bathtub, and vanity. (5x8) | $29,196 |
| Aug 20, 2012 | Completed final sign-off Feb 2013 | 45 Miraloma Dr | interior remodel only: kitchen cabinet layout remodel. replace windows in kind due to rot/age, delete one bath at 2nd floor, and convert to master suite layout. remove second kitchen.Details
interior remodel only: kitchen cabinet layout remodel. replace windows in kind due to rot/age, delete one bath at 2nd floor, and convert to master suite layout. remove second kitchen. | $46,000 |
| Mar 1, 2012 | Completed final sign-off Jul 2012 | 311 19th Av | remodel bathroom and kitchen, install drywall, kitchen cabinets, bathroom tiles, vinyl floor and paint. replace 5 windows in backrooms, not visable from street, no change on walls and opening.Details
remodel bathroom and kitchen, install drywall, kitchen cabinets, bathroom tiles, vinyl floor and paint. replace 5 windows in backrooms, not visable from street, no change on walls and opening. | $14,000 |
| Oct 5, 2011 | Completed final sign-off Feb 2012 | 3619 25th St | remodel bathroom and kitchen . install drywall using 58/8 " type x gypsum board, kitchen cabinets, bathroom tiles, vinyl ffoor and paint. replace 10 windowsDetails
remodel bathroom and kitchen . install drywall using 58/8 " type x gypsum board, kitchen cabinets, bathroom tiles, vinyl ffoor and paint. replace 10 windows | $14,000 |
| Jul 12, 2011 | Completed final sign-off Aug 2011 | 1499 Grant Av | 1. replace floor tiles, patch dry wall. painting. no work in bathroom, finishes only. 1134b 2.1. exp 4.Details
1. replace floor tiles, patch dry wall. painting. no work in bathroom, finishes only. 1134b 2.1. exp 4. | $7,000 |
| Nov 8, 2010 | Completed final sign-off Apr 2011 | 1106 Valencia St | unit #d: remodel bathroom and kitchen, removed and install 5/8" type x gyp dry wall, kitchen cabinets, bathroom tiles, vinyl floor and painting, no structural work, comply with is nov 200911541 and 201057606Details
unit #d: remodel bathroom and kitchen, removed and install 5/8" type x gyp dry wall, kitchen cabinets, bathroom tiles, vinyl floor and painting, no structural work, comply with is nov 200911541 and 201057606 | $14,000 |
| Sep 30, 2009 | Completed final sign-off May 2010 | 524 Moultrie St | kitchen & bathroom remodeling at main floor. one (n) bathroom & two (n) dormers in second floor.Details
kitchen & bathroom remodeling at main floor. one (n) bathroom & two (n) dormers in second floor. | $65,000 |