Back to bathroom remodel contractors
The Home Doctors Inc.
- Based in
- Novato
- On San Francisco permits
- Mar 2000 to May 2026
- Last 24 months
- 1 permit filed
112 permits since 2000: 88 completed, 11 never finaled, 13 expired or cancelled.
Of the 11 never-finaled permits, 1 is 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 16 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2026 | Completed final sign-off Aug 2026 | 95 Mccoppin St | in-kind remodeling of 1 bathroom(s) in 4th fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 4th fl with 0 shower pan(s). | $18,000 |
| Jun 1, 2018 | Completed final sign-off Jun 2019 | 88 Surrey St | remodel 2 bathrooms, all fixtures remain in (e) locationsDetails
remodel 2 bathrooms, all fixtures remain in (e) locations | $50,000 |
| May 19, 2016 | Completed final sign-off Aug 2016 | 60 Hiliritas Av | complete bathroom remodel, & fixtures remain in existing locations.Details
complete bathroom remodel, & fixtures remain in existing locations. | $15,000 |
| Nov 19, 2014 | Never finaled issued Nov 2014, no final | 55 Red Rock Wy | bathroom remodel - fixtures installed in same location. no alteration of wall, windows and doorDetails
bathroom remodel - fixtures installed in same location. no alteration of wall, windows and door | $10,000 |
| Nov 20, 2013 | Completed final sign-off Jan 2014 | 343 Frederick St | unit #1: remodel existing hall bathroom, all fixtures replaced in existing locationsDetails
unit #1: remodel existing hall bathroom, all fixtures replaced in existing locations | $18,000 |
| Apr 30, 2012 | Completed final sign-off Jun 2012 | 1906 Lyon St | one bath remodel in kindDetails
one bath remodel in kind | $20,000 |
| Oct 4, 2011 | Completed final sign-off Dec 2011 | 208 Lake Merced Hill No Bl | bathroom remodel, in kind.Details
bathroom remodel, in kind. | $20,000 |
| Oct 23, 2007 | Completed final sign-off Jun 2008 | 47 Melrose Av | kitchen facelift, new counter, new basin and fuacet, alter 1 cab for dishwasher. bath faucet, new tile floor and surround, new vanity, basin and faucet 1 new toilet, all in extg locationsDetails
kitchen facelift, new counter, new basin and fuacet, alter 1 cab for dishwasher. bath faucet, new tile floor and surround, new vanity, basin and faucet 1 new toilet, all in extg locations | $14,500 |
| Sep 28, 2005 | Completed final sign-off Feb 2006 | 1659 16th Av | basic bath remodel. shower, tub, toilet, vanity stay at present location.Details
basic bath remodel. shower, tub, toilet, vanity stay at present location. | $6,000 |
| Mar 6, 2003 | Completed final sign-off Jun 2003 | 2295 Vallejo St | remodel bathroom:shower,toilet,vanitytoremain same location. elec repairs to existing sob panelDetails
remodel bathroom:shower,toilet,vanitytoremain same location. elec repairs to existing sob panel | $10,000 |
| Aug 7, 2002 | Completed final sign-off Jan 2004 | 345 Bocana St | vertical & horizontal addition-add shed dormers to roof, remodel stairs, and add bathroomDetails
vertical & horizontal addition-add shed dormers to roof, remodel stairs, and add bathroom | $45,000 |
| Jul 3, 2002 | Completed final sign-off Oct 2002 | 1286 Church St | kitchen & bath remodel w/new plumbingDetails
kitchen & bath remodel w/new plumbing | $27,000 |
| May 16, 2002 | Completed final sign-off Oct 2002 | 164 Diamond St | top unit-remodel bath, install whirlpool tub, retile floor, install vanity cab/sheetrock/corian @tubDetails
top unit-remodel bath, install whirlpool tub, retile floor, install vanity cab/sheetrock/corian @tub | $15,000 |
| Oct 4, 2001 | Expired or cancelled expired May 2002 | 1747 Cayuga Av | remodel fam room install extra elec outlets remodel bath @ downstairs no change in wallsDetails
remodel fam room install extra elec outlets remodel bath @ downstairs no change in walls | $12,000 |
| May 9, 2001 | Completed final sign-off Jun 2001 | 2654 21st Av | remodel bathroom, new tub, controls, toilet, sink, tile, drywallDetails
remodel bathroom, new tub, controls, toilet, sink, tile, drywall | $12,000 |
| Apr 17, 2001 | Completed final sign-off Aug 2001 | 140 Forest Side Av | partial remodel of hall bath & master bathDetails
partial remodel of hall bath & master bath | $5,000 |
| Sep 11, 2000 | Completed final sign-off Oct 2000 | 163 Liberty St | to clarify architectural layout structural details on 9922998 &9703928.delete windows, remodel bath,Details
to clarify architectural layout structural details on 9922998 &9703928.delete windows, remodel bath, | |
| Apr 27, 2000 | Expired or cancelled expired Oct 2000 | 1145 Pine St | remove & replace bath fixtures & tile, in kindDetails
remove & replace bath fixtures & tile, in kind | $10,200 |
| Apr 11, 2000 | Completed final sign-off Oct 2000 | 45 Grand View Av | revised plans showing changes to floor plan-remove walls in 1st floor kitchen, 2nd floor bathroom, bDetails
revised plans showing changes to floor plan-remove walls in 1st floor kitchen, 2nd floor bathroom, b | $5,000 |