Back to bathroom remodel contractors
The Fine European Construction/Uwb Dober
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Mar 2021
- Last 24 months
- 0 permits filed
75 permits since 2000: 61 completed, 6 never finaled, 8 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 3 days from filing to permit and 233 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2015 | Completed final sign-off Nov 2016 | 2230 Bush St | proposed work is to add a bedroom & bathroom @ the roof level & to add a rear roof deck. not visible from public right of way. no change to number of dwelling unit. no change to maximum height. ** maher: compliance with ordinance no# 155-13 not required **Details
proposed work is to add a bedroom & bathroom @ the roof level & to add a rear roof deck. not visible from public right of way. no change to number of dwelling unit. no change to maximum height. ** maher: compliance with ordinance no# 155-13 not required ** | $90,000 |
| Feb 5, 2014 | Completed final sign-off Aug 2014 | 639 Howard St | replace non-compliant toilet room & coffee area with new ada compliant bathrooms & coffee area (same fixture count). barrier removal project, add new compliant electrical & lighting to meet state energy compliance. (m.e.p. under separate permit.)Details
replace non-compliant toilet room & coffee area with new ada compliant bathrooms & coffee area (same fixture count). barrier removal project, add new compliant electrical & lighting to meet state energy compliance. (m.e.p. under separate permit.) | $168,000 |
| Dec 5, 2013 | Completed final sign-off Aug 2014 | 1980 Vallejo St | remodel existing single family residential unit within a multi unit building including kitchen and 3 bathrooms. no mechanical or structural work.Details
remodel existing single family residential unit within a multi unit building including kitchen and 3 bathrooms. no mechanical or structural work. | $75,000 |
| Nov 7, 2013 | Completed final sign-off Sep 2019 | 596 Valley St | remove dilapidated/rotting rear porch, replace (e) 2nd floor window, replace basement door & add windows & deck at rear. repair & remodel kitchen, add 1st floor powder room. replace fixtures & finishes in 2nd floor bathroomDetails
remove dilapidated/rotting rear porch, replace (e) 2nd floor window, replace basement door & add windows & deck at rear. repair & remodel kitchen, add 1st floor powder room. replace fixtures & finishes in 2nd floor bathroom | $48,000 |
| Jun 27, 2001 | Completed final sign-off Oct 2001 | 633 Howard St | build new bearing partitions as shown, remodel 2 bathrooms, new drywall as needed, new doors (interiDetails
build new bearing partitions as shown, remodel 2 bathrooms, new drywall as needed, new doors (interi | $50,000 |
| May 14, 2001 | Completed final sign-off Sep 2001 | 3372 21st St | no structural work-remodel existing bathroom, lower floor, new drywall as needed, replace ex tiles,Details
no structural work-remodel existing bathroom, lower floor, new drywall as needed, replace ex tiles, | $10,200 |
| Mar 23, 2001 | Completed final sign-off Nov 2001 | 3820 Cesar Chavez St | remodel existing bathroom 2nd flr. replace shower,toilet & sink.replace drdywall & tiles. no structuDetails
remodel existing bathroom 2nd flr. replace shower,toilet & sink.replace drdywall & tiles. no structu | $11,500 |
| Nov 2, 2000 | Completed final sign-off Oct 2001 | 300 Beale St | repl ex non struct partitions,remodel kitchen & 2 bathsDetails
repl ex non struct partitions,remodel kitchen & 2 baths | $68,000 |