The Electrician
- Based in
- San Francisco
- On San Francisco permits
- Aug 2002 to Sep 2009
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 1225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 742 Innes Av | comply with complaint: repair rear stairs and deck, deteriorated sideing, paint, weatherproof and paint e siding. repair in kind, less than 20%Details
comply with complaint: repair rear stairs and deck, deteriorated sideing, paint, weatherproof and paint e siding. repair in kind, less than 20% | $5,000 |
| Apr 5, 2007 | Completed final sign-off Dec 2013 | 143 Park St | non structural build out of conditioned space in an existing non conditioned space (garage-level), in kind replacement of front stairs and garage door. extension ot e deck at sideDetails
non structural build out of conditioned space in an existing non conditioned space (garage-level), in kind replacement of front stairs and garage door. extension ot e deck at side | $50,000 |