The Craftsman Contractor
- Based in
- Greenbrae
- On San Francisco permits
- Mar 2022 to Apr 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2022 | Never finaled issued Apr 2022, no final | 388 Park St | replace 26 windows (street facing), repair and replace dryrot siding. paint exterior facade.Details
replace 26 windows (street facing), repair and replace dryrot siding. paint exterior facade. | $20,000 |
| Mar 8, 2022 | Completed final sign-off May 2023 | 573 Scott St | remodel bath and kitchen in units g,i; revised scope to include bathroom and kitchen in units g and i only, dmj 03/14/2022;Details
remodel bath and kitchen in units g,i; revised scope to include bathroom and kitchen in units g and i only, dmj 03/14/2022; | $10,000 |