Back to bathroom remodel contractors
The Bay Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to May 2023
- Last 24 months
- 0 permits filed
16 permits since 2000: 14 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 2 never finaled. Typically 10 days from filing to permit and 228 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2023 | Never finaled issued May 2023, no final | 3232 Taraval St | unit# 5: remodeling the bathroom in kind. upgrade plumbing and electrical. replace the bathtub, sink, toilet, and faucets, and painting. no floor plan change, no structural work, no wall layout change.Details
unit# 5: remodeling the bathroom in kind. upgrade plumbing and electrical. replace the bathtub, sink, toilet, and faucets, and painting. no floor plan change, no structural work, no wall layout change. | $8,500 |
| Jun 21, 2022 | Completed final sign-off Sep 2022 | 191 Caine Av | remodel one (e) bathroom @ 2nd fl. replace bathtub, toilet, sink & hardwares. upgrad electrical wires & plumbing works. no structures change.Details
remodel one (e) bathroom @ 2nd fl. replace bathtub, toilet, sink & hardwares. upgrad electrical wires & plumbing works. no structures change. | $12,000 |
| Jan 21, 2021 | Completed final sign-off May 2021 | 2087 31st Av | remodel existing bathroom. replace shower, tiles, vanity sink, light fixtures, outlets and painting the room. no removal of wallsDetails
remodel existing bathroom. replace shower, tiles, vanity sink, light fixtures, outlets and painting the room. no removal of walls | $7,500 |
| Aug 30, 2019 | Completed final sign-off May 2021 | 327 Phelan Av | relocate interior stair and bathroom convert dining room to a bedroom, add a full bath, remodel kitchen on the 2nd fl. add 2 bedrooms, office & familly room, full bathroom at the 1st fl.Details
relocate interior stair and bathroom convert dining room to a bedroom, add a full bath, remodel kitchen on the 2nd fl. add 2 bedrooms, office & familly room, full bathroom at the 1st fl. | $100,000 |
| Dec 13, 2018 | Completed final sign-off Jul 2019 | 2523 39th Av | to add 2 bedroom and 2 full bath and 1 office on (e) ground flr to replace (e) furnance & w/h, relocate (e) w/d. no exterior work.no work on 2nd floorDetails
to add 2 bedroom and 2 full bath and 1 office on (e) ground flr to replace (e) furnance & w/h, relocate (e) w/d. no exterior work.no work on 2nd floor | $60,000 |
| Nov 29, 2018 | Completed final sign-off Sep 2019 | 471 06th Av | remodel (e) units, 2nd floor unit 1 & 3rd floor, unit #4. work included remodel (e) kitchen, bathroom & new bedrooms and new bathroom. no exrerior work.Details
remodel (e) units, 2nd floor unit 1 & 3rd floor, unit #4. work included remodel (e) kitchen, bathroom & new bedrooms and new bathroom. no exrerior work. | $99,000 |
| May 24, 2018 | Never finaled issued Jun 2018, no final | 90 Whitney St | revision to approved permit #201803123387. change bathroom configuration at basement & 3nd fl. change kitchen island, fireplace configuration at1st fl; replace & enlarge all front windows; use lvl floor joist instead of beam.Details
revision to approved permit #201803123387. change bathroom configuration at basement & 3nd fl. change kitchen island, fireplace configuration at1st fl; replace & enlarge all front windows; use lvl floor joist instead of beam. | $2,000 |
| Dec 28, 2017 | Completed final sign-off May 2019 | 1969 17th Av | 1st fl: construct (3) new bedrooms, (2) new bathroom, (1) new family room, and new laundry. 2nd fl: remodel (e) bathroom & kitchen. remove/fill-in rear garage door.add new home office & new bathroomDetails
1st fl: construct (3) new bedrooms, (2) new bathroom, (1) new family room, and new laundry. 2nd fl: remodel (e) bathroom & kitchen. remove/fill-in rear garage door.add new home office & new bathroom | $60,000 |