Back to bathroom remodel contractors
Terry Mc Daniel Construction
- Based in
- Corte Madera
- On San Francisco permits
- Jan 2001 to Sep 2026
- Last 24 months
- 5 permits filed
173 permits since 2000: 148 completed, 1 in progress, 16 never finaled, 8 expired or cancelled.
Of the 16 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 15 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2025 | Completed final sign-off Aug 2026 | 3887 18th St | modify and legalize laundry space located at the 1st story above basement garage, permit #980093951 in habitable space studio with bathDetails
modify and legalize laundry space located at the 1st story above basement garage, permit #980093951 in habitable space studio with bath | $55,000 |
| Jul 16, 2025 | Completed final sign-off Jan 2026 | 40 21st Av | in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment. | $86,400 |
| Apr 26, 2021 | Completed final sign-off Jul 2023 | 330 Magellan Av | interior wall changes. remodel 2.5 baths. lofting (e) upper floor ceilings. structural roof reinforcement. remove 2 front steps & lower front door at exterior. replace doors & windows. remove side entrance door & stair. no change in sqft & bldg height. new skylights.Details
interior wall changes. remodel 2.5 baths. lofting (e) upper floor ceilings. structural roof reinforcement. remove 2 front steps & lower front door at exterior. replace doors & windows. remove side entrance door & stair. no change in sqft & bldg height. new skylights. | $150,000 |
| Mar 30, 2021 | Completed final sign-off Nov 2021 | 1872 Turk St | remodel of (e) bathrm in single unit (this address) of 4 unit condo building. includeing window changes in bathroom at east elevation also provide additional recessed lighting in entry, dining rm, & hallway. no work in common area or changes in ft or volume, habitable sq ft, and no changes in frontDetails
remodel of (e) bathrm in single unit (this address) of 4 unit condo building. includeing window changes in bathroom at east elevation also provide additional recessed lighting in entry, dining rm, & hallway. no work in common area or changes in ft or volume, habitable sq ft, and no changes in front | $30,500 |
| Jan 5, 2021 | Completed final sign-off Apr 2024 | 346 21st Av | interior remodel of bathroom. replace fixtures & finishes. replace interior door. no additional sqft to bldg. no change in (e) footprint.Details
interior remodel of bathroom. replace fixtures & finishes. replace interior door. no additional sqft to bldg. no change in (e) footprint. | $17,000 |
| Mar 9, 2020 | Completed final sign-off Oct 2020 | 179 14th Av | renovate water damaged ground floor area: new sheetrock from floor to approx 1' up. new flooring, baseboards and door caging, new shower stall in bathroom and filed floor. all due to water damage from over flow from street. all work in-kind repair work.Details
renovate water damaged ground floor area: new sheetrock from floor to approx 1' up. new flooring, baseboards and door caging, new shower stall in bathroom and filed floor. all due to water damage from over flow from street. all work in-kind repair work. | $50,000 |
| Sep 9, 2019 | Completed final sign-off Aug 2020 | 643 33rd Av | revision to app#201601207463. replace foundation at back of house, new deck and stairs at back 2 pairs of french doors 1st & 2nd level at back. bath remodel on 3rd floor. install structural beams in garage shearwall at 1st and 2nd level at back.Details
revision to app#201601207463. replace foundation at back of house, new deck and stairs at back 2 pairs of french doors 1st & 2nd level at back. bath remodel on 3rd floor. install structural beams in garage shearwall at 1st and 2nd level at back. | $50,000 |
| Oct 28, 2015 | Completed final sign-off May 2016 | 1728 09th Av | kitchen remodel open up wall from kitchen to dining room, open wall from kitchen to hallway, master bath remodel, guest bath remodel, structural work in garage to support center beamDetails
kitchen remodel open up wall from kitchen to dining room, open wall from kitchen to hallway, master bath remodel, guest bath remodel, structural work in garage to support center beam | $150,000 |
| Jun 3, 2008 | Never finaled issued Jun 2008, no final | 2924 Webster St | replace 19 windows in kind, none visible from street at 2924 & 2926 webster, d-h energy paks, 1 kitchen & 1 bath, remodel at 2924 webster, no structural changes, u-factor = 0.67 maxDetails
replace 19 windows in kind, none visible from street at 2924 & 2926 webster, d-h energy paks, 1 kitchen & 1 bath, remodel at 2924 webster, no structural changes, u-factor = 0.67 max | $60,000 |
| Jul 2, 2007 | Completed final sign-off Oct 2007 | 342 Divisadero St | work @ 342 divisadero st. only. revision to pa# 2007/05/22/1966. to show proposed partition @ storage-employee access area to be 8'0" in height. no additional wall to be added in dog bath area.Details
work @ 342 divisadero st. only. revision to pa# 2007/05/22/1966. to show proposed partition @ storage-employee access area to be 8'0" in height. no additional wall to be added in dog bath area. | |
| May 22, 2007 | Completed final sign-off Oct 2007 | 342 Divisadero St | plumbing to reconstruct bathroom, add 3 dog baths. electrical to change lights. add wall partitions.Details
plumbing to reconstruct bathroom, add 3 dog baths. electrical to change lights. add wall partitions. | $40,000 |
| Aug 15, 2006 | Completed final sign-off Oct 2006 | 1652 Page St | remodel kchn-new cabs and appliances (one kchn). remodel bathroom-new tub, toilet, vanity cab, tile floor and walls at tub 42" from property lines(one bathroom). remove 5 aluminum wndws and replace with wood sash double hung energy paksDetails
remodel kchn-new cabs and appliances (one kchn). remodel bathroom-new tub, toilet, vanity cab, tile floor and walls at tub 42" from property lines(one bathroom). remove 5 aluminum wndws and replace with wood sash double hung energy paks | $18,000 |
| Aug 2, 2006 | Completed final sign-off Oct 2006 | 15 Red Rock Wy | add 1/2 " soundboard and sheetrock at common walls and ceiling. add sound board and underlayment for carpet on floor. remove closet doors and non bearing partition above doors. kitchen and bath remodel. no structural changes. unit 208Details
add 1/2 " soundboard and sheetrock at common walls and ceiling. add sound board and underlayment for carpet on floor. remove closet doors and non bearing partition above doors. kitchen and bath remodel. no structural changes. unit 208 | $18,000 |
| May 24, 2006 | Completed final sign-off Feb 2007 | 50 Graystone Tr | remodel existing bathroom (master)Details
remodel existing bathroom (master) | $15,000 |
| Jun 15, 2005 | Completed final sign-off Dec 2005 | 2283 27th Av | replace 10 windows in kind,none visible from street.remodel 2 bathrooms/kitchen.provide exhaust fanDetails
replace 10 windows in kind,none visible from street.remodel 2 bathrooms/kitchen.provide exhaust fan | $48,500 |
| Oct 8, 2002 | Completed final sign-off Mar 2005 | 64 Graystone Tr | demo bath at front right corner;rmve part of 2 exterior walls & floor & roofDetails
demo bath at front right corner;rmve part of 2 exterior walls & floor & roof | $10,000 |
| Aug 27, 2002 | Expired or cancelled expired Oct 2008 | 2427 Divisadero St | demo exist walls at grd fl per plan. reframe for family rm w/ half bath,replace doors,windows w/sameDetails
demo exist walls at grd fl per plan. reframe for family rm w/ half bath,replace doors,windows w/same | $7,000 |