Back to bathroom remodel contractors
Terra Firma Builders
- Based in
- Santa Rosa
- On San Francisco permits
- Dec 2017 to Jan 2025
- Last 24 months
- 1 permit filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 229 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2025 | Completed final sign-off Jan 2026 | 2511 Polk St | light drywall remediation, new shower fixture, vanity and refilling the bathtub area, new insulation. small dry rot, r/r few studs. remove and install shower/bath area due to leak.Details
light drywall remediation, new shower fixture, vanity and refilling the bathtub area, new insulation. small dry rot, r/r few studs. remove and install shower/bath area due to leak. | $5,000 |
| Dec 15, 2023 | Completed final sign-off Feb 2024 | 11 Crestline Dr | unit# 1: kitchen - like for like- new countertops, cabinets, sink, electrical to code w/ dedicated breakers. bath - like for like - new tub, tile walls, floor, sink, vanity, electrical to code w/ dedicated breakers.Details
unit# 1: kitchen - like for like- new countertops, cabinets, sink, electrical to code w/ dedicated breakers. bath - like for like - new tub, tile walls, floor, sink, vanity, electrical to code w/ dedicated breakers. | $48,000 |
| Dec 8, 2017 | Completed final sign-off Aug 2018 | 541 Vallejo St | 2/f: add one (n) bathroom, remodel (e) kitchen, replace sheetrock at front bedroom. maher naDetails
2/f: add one (n) bathroom, remodel (e) kitchen, replace sheetrock at front bedroom. maher na | $30,000 |