Terence Keenan Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Nov 2017
- Last 24 months
- 0 permits filed
54 permits since 2000: 47 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 0 days from filing to permit and 101 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2016 | Completed final sign-off Oct 2017 | 177 Wool St | replacement & legalization of an (e) deck & repair of an (e) stair serving the deck.Details
replacement & legalization of an (e) deck & repair of an (e) stair serving the deck. | $25,000 |
| Nov 17, 2009 | Completed final sign-off Dec 2009 | 170 Upper Tr | remove stucco 12" around deck, remove tile at leak area, patch membrane, retile, restucco, not viewable from streetDetails
remove stucco 12" around deck, remove tile at leak area, patch membrane, retile, restucco, not viewable from street | $7,000 |
| Nov 10, 2004 | Completed final sign-off Feb 2006 | 33 Rossmoor Dr | new rear wood deck at level one with wood stair to backyard.Details
new rear wood deck at level one with wood stair to backyard. | $20,000 |
| Jun 14, 2004 | Completed final sign-off Sep 2004 | 100 Clifford Tr | repair leaking roof deck.r/r joists, plywood deck,sliding door.flashing.deck membrane, misc trim&sidDetails
repair leaking roof deck.r/r joists, plywood deck,sliding door.flashing.deck membrane, misc trim&sid | $2,000 |
| Feb 12, 2003 | Completed final sign-off Mar 2003 | 1434 15th Av | repair in kind rear decks @ address above handrails to be code complying repair work not more thanDetails
repair in kind rear decks @ address above handrails to be code complying repair work not more than | $5,500 |