Back to bathroom remodel contractors
Templeman Builders
- Based in
- San Francisco
- On San Francisco permits
- Apr 2011 to May 2016
- Last 24 months
- 0 permits filed
27 permits since 2000: 18 completed, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2016 | Completed final sign-off May 2016 | 118 Midcrest Wy | revision to 201303051477; closing door between hall & kitchen on 2nd flr, and add kitchen & bath remodel; changing fixtures,devices,& fixtures, like for like without change of layout and locations.Details
revision to 201303051477; closing door between hall & kitchen on 2nd flr, and add kitchen & bath remodel; changing fixtures,devices,& fixtures, like for like without change of layout and locations. | |
| Dec 11, 2015 | Completed final sign-off Jun 2016 | 844 Clayton St | refresh two bathrooms, changing out fixts & finishes like for like, no other significant changes, replacing two windows like for like not facing street. no alteration of wall & door.Details
refresh two bathrooms, changing out fixts & finishes like for like, no other significant changes, replacing two windows like for like not facing street. no alteration of wall & door. | $28,000 |
| Jan 26, 2015 | Completed final sign-off May 2015 | 300 03rd St | light remodel of kitchen and one full bath, replacing plumbing and electrical fixtures and finishes like for like, in their original locations. no change in openings and layout. all led lighting (all high efficacxy lightings).Details
light remodel of kitchen and one full bath, replacing plumbing and electrical fixtures and finishes like for like, in their original locations. no change in openings and layout. all led lighting (all high efficacxy lightings). | $5,000 |
| Aug 22, 2014 | Completed final sign-off Oct 2014 | 601 Van Ness Av | new floor to patch and refinish, tile @ kitchen floor and bath. new countertops @ kitchen and bath. new baseboards throughout installed, drywall patching & painting. no walls to be removed.Details
new floor to patch and refinish, tile @ kitchen floor and bath. new countertops @ kitchen and bath. new baseboards throughout installed, drywall patching & painting. no walls to be removed. | $2,500 |
| Jan 8, 2014 | Never finaled issued Jan 2014, no final | 443 Broderick St | to comply with physical inspection report #cc-7281. includes requested permission for kitchen remodel in units #445 & #447 (existing condition), finishes only "like for like" respecting original locations, and request for existing bathroom in #447. remodel done finishes only. like for like respectinDetails
to comply with physical inspection report #cc-7281. includes requested permission for kitchen remodel in units #445 & #447 (existing condition), finishes only "like for like" respecting original locations, and request for existing bathroom in #447. remodel done finishes only. like for like respectin | $5,000 |
| Dec 13, 2013 | Completed final sign-off May 2014 | 300 03rd St | remodel kitchen & bath. changing out fixtures & finishes, "like for like". footprint & locations remain the same. no architectural changes. some plumbing & electrical requiring permit.Details
remodel kitchen & bath. changing out fixtures & finishes, "like for like". footprint & locations remain the same. no architectural changes. some plumbing & electrical requiring permit. | $21,000 |
| Apr 15, 2011 | Expired or cancelled expired Jun 2015 | 1302 Masonic Av | remodel existing 3rd floor- add 1 bathroom, add partition walls, add 64 s.f. dormer in new bathroom.Details
remodel existing 3rd floor- add 1 bathroom, add partition walls, add 64 s.f. dormer in new bathroom. | $45,000 |