Back to bathroom remodel contractors
Teets Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Mar 2016
- Last 24 months
- 0 permits filed
28 permits since 2000: 21 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 21, 2015 | Completed final sign-off Dec 2016 | 3747 Divisadero St | full remodel to kitchen & (3) bathrooms, all fixtures, walls & appliances stay in (e) positions; replace hardwood flooring throughout home wiht 3/4" white oak. compliance with maher ordinance no 155-13 not required.Details
full remodel to kitchen & (3) bathrooms, all fixtures, walls & appliances stay in (e) positions; replace hardwood flooring throughout home wiht 3/4" white oak. compliance with maher ordinance no 155-13 not required. | $127,500 |
| Sep 24, 2015 | Completed final sign-off Jan 2016 | 1380 Greenwich St | remove (e) vanity, toilet and shower tub. replacing all items with new fixtures. change floor tile. all work to be in master bathDetails
remove (e) vanity, toilet and shower tub. replacing all items with new fixtures. change floor tile. all work to be in master bath | $10,000 |
| Sep 28, 2012 | Never finaled issued Oct 2012, no final | 1200 Polk St | change old ceramic tile floor at bathroom with new ceramic tile (100'), change old carpet floor to hardwood floor (300') patch all damage on drywall and new paint, approx 4"Details
change old ceramic tile floor at bathroom with new ceramic tile (100'), change old carpet floor to hardwood floor (300') patch all damage on drywall and new paint, approx 4" | $1,000 |
| Nov 26, 2007 | Completed final sign-off Dec 2007 | 361 Frederick St | add washer and dryer on top floor at bathroom areaDetails
add washer and dryer on top floor at bathroom area | $1,500 |
| Jan 18, 2007 | Completed final sign-off Apr 2007 | 1301 Clay St | bath remodel new plumb and elect. tile, tub, shower, vanity.Details
bath remodel new plumb and elect. tile, tub, shower, vanity. | $10,000 |
| Feb 22, 2006 | Completed final sign-off Apr 2006 | 3125 Quintara St | remodel kchn with new electrical using extg plmg/remodel bth upstairs with new electrical plmg fixtures/electrical box upgrade to house in teh garage /replacing outlets, appliance and fixture in kchn and bathDetails
remodel kchn with new electrical using extg plmg/remodel bth upstairs with new electrical plmg fixtures/electrical box upgrade to house in teh garage /replacing outlets, appliance and fixture in kchn and bath | $67,000 |
| Jan 27, 2005 | Completed final sign-off Aug 2005 | 127 Belvedere St | kitchen & bathroom remodel.Details
kitchen & bathroom remodel. | $40,000 |
| Jan 27, 2005 | Expired or cancelled expired Oct 2007 | 129 Belvedere St | bath & kitchen remodelDetails
bath & kitchen remodel | $40,000 |