Back to bathroom remodel contractors
Ted Nelson Const.
- Based in
- Redding
- On San Francisco permits
- Sep 2008 to May 2009
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2008 | Completed final sign-off Mar 2009 | 1227 12th Av | remodel within (e) envelop connect kitchen & back kitchen by removing partition w/door & window. partially remove wall between kitchen & dining room. new half bath on second floor. new fixtures & floor covering in third floor bath. reinforce (e) foundation.Details
remodel within (e) envelop connect kitchen & back kitchen by removing partition w/door & window. partially remove wall between kitchen & dining room. new half bath on second floor. new fixtures & floor covering in third floor bath. reinforce (e) foundation. | $35,000 |