Back to bathroom remodel contractors
Tech Line Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Sep 2020 to Jul 2026
- Last 24 months
- 8 permits filed
13 permits since 2000: 7 completed, 5 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 5 completed, 3 in progress, 1 never finaled. Typically 51 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2026 | In progress issued Jul 2026 | 2132 16th Av | revision to pa# 202107073908 & 202605201657. remodel second floor bathroom in kind.Details
revision to pa# 202107073908 & 202605201657. remodel second floor bathroom in kind. | $25,000 |
| Apr 16, 2026 | Completed final sign-off Jun 2026 | 701 Pennsylvania Av | unit#107: like to like bathroom remodel, 2nd floor unit 107. replace shower valve, tiles, vanity, recessed lighting, toilet, vanity light, paintDetails
unit#107: like to like bathroom remodel, 2nd floor unit 107. replace shower valve, tiles, vanity, recessed lighting, toilet, vanity light, paint | $20,000 |
| Feb 18, 2026 | In progress issued May 2026 | 466 Staples Av | build a powder room. like for like existing bathroom remodelDetails
build a powder room. like for like existing bathroom remodel | $31,000 |
| Apr 1, 2025 | Completed final sign-off Oct 2025 | 2250 22nd Av | like for like kitchen and 2x bathroom remodel . drywall on second floor replace in kind. reroofing torch down. recessed lights and update main panel to 200 amps. replace (e) 6 windows vinyl to fiber glass windows; 1 of the windows facing street. remodel lower level wetbar.max u-factor 0.30.Details
like for like kitchen and 2x bathroom remodel . drywall on second floor replace in kind. reroofing torch down. recessed lights and update main panel to 200 amps. replace (e) 6 windows vinyl to fiber glass windows; 1 of the windows facing street. remodel lower level wetbar.max u-factor 0.30. | $60,000 |
| Feb 4, 2025 | Completed final sign-off Dec 2025 | 2250 22nd Av | first floor convert storage into media room on ground floor to media room. 2nd floor relocate the skylight and infill light well. remodel bathroom.Details
first floor convert storage into media room on ground floor to media room. 2nd floor relocate the skylight and infill light well. remodel bathroom. | $100,000 |
| Aug 14, 2024 | Completed final sign-off Nov 2024 | 120 Beaumont Av | like for like bathroom remodel. no layout will be changed. new tile/new tile flooring, vantiy, paint, shower door.Details
like for like bathroom remodel. no layout will be changed. new tile/new tile flooring, vantiy, paint, shower door. | $20,000 |
| Oct 18, 2023 | Completed final sign-off Nov 2025 | 815 Joost Av | re-plan layout of 1st & the lower fl. add total of (2) bedrm & (2) baths. add (n) family rm, (n) office lower fl. redesign illegal space lower fl to comply w/ regulations & increase living area. provide elec (n) equip, update elec meter from 100a to 200a. (n) plumb, ligthing, water heater, elecDetails
re-plan layout of 1st & the lower fl. add total of (2) bedrm & (2) baths. add (n) family rm, (n) office lower fl. redesign illegal space lower fl to comply w/ regulations & increase living area. provide elec (n) equip, update elec meter from 100a to 200a. (n) plumb, ligthing, water heater, elec | $250,000 |
| Jul 7, 2021 | Never finaled issued Jul 2021, no final | 2132 16th Av | replace tiles (bathroom)Details
replace tiles (bathroom) | $10,000 |
| Sep 1, 2020 | In progress issued Mar 2024 | 2132 16th Av | addition of 2 bedrooms and 1 bathroom over existing first floor of living space to provide stair to new flr(third story).Details
addition of 2 bedrooms and 1 bathroom over existing first floor of living space to provide stair to new flr(third story). | $160,000 |