Tao's Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Feb 2019
- Last 24 months
- 0 permits filed
24 permits since 2000: 21 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2019 | Completed final sign-off Mar 2019 | 849 Paris St | replace all four front aluminum windows - over entry, install triple casement (casement - fixed - casement); at bay, install casement window at left and right side of bay, fixed in center of bay. all within existing openings, all to be aluminum-clad wood windows. no other work.Details
replace all four front aluminum windows - over entry, install triple casement (casement - fixed - casement); at bay, install casement window at left and right side of bay, fixed in center of bay. all within existing openings, all to be aluminum-clad wood windows. no other work. | $500 |
| Feb 8, 2019 | Completed final sign-off Mar 2019 | 849 Paris St | rev to cost for pa#201808096872. inspector request to increase job value.Details
rev to cost for pa#201808096872. inspector request to increase job value. | $60,000 |
| Nov 1, 2018 | Completed final sign-off Sep 2019 | 2227 34th Av | exploratory demo of upstair kitchen, bathroom & downstair wall. 100 sq.Details
exploratory demo of upstair kitchen, bathroom & downstair wall. 100 sq. | $1,500 |
| Aug 9, 2018 | Completed final sign-off Feb 2019 | 849 Paris St | construct 2 bedroom, 1 full bathroom, 1 media rm at ground fl. add 1 new bathrm, office, relocate kitchen & construct skylight & in-fill partial (e) lightwell at 2nd fl. construct new deck w/staircase at rear of bldg. (size approx 19'x8')Details
construct 2 bedroom, 1 full bathroom, 1 media rm at ground fl. add 1 new bathrm, office, relocate kitchen & construct skylight & in-fill partial (e) lightwell at 2nd fl. construct new deck w/staircase at rear of bldg. (size approx 19'x8') | $82,000 |
| Jun 8, 2018 | Completed final sign-off Mar 2019 | 849 Paris St | demolition upstair kitchen, bathroom & downstair wall.Details
demolition upstair kitchen, bathroom & downstair wall. | $500 |
| Mar 29, 2018 | Completed final sign-off Aug 2018 | 32 Acton St | 1)remodel extg kitchen, one bath room, add one new bathroom at 2nd floor. 2)construct 2 bedrooms, one full bathroom, media room, & laundry at ground floor. 3)construct new deck at rear of bldg(size approx 19'x5').Details
1)remodel extg kitchen, one bath room, add one new bathroom at 2nd floor. 2)construct 2 bedrooms, one full bathroom, media room, & laundry at ground floor. 3)construct new deck at rear of bldg(size approx 19'x5'). | $62,000 |
| Jan 4, 2018 | Completed final sign-off Apr 2018 | 1350 41st Av | revision to pa #201703201821 - construct one bathroom & relcoate laundry. all work at ground floor.Details
revision to pa #201703201821 - construct one bathroom & relcoate laundry. all work at ground floor. | $12,000 |
| Jun 26, 2017 | Completed final sign-off Oct 2017 | 135 Farallones St | legalize two (e) bedroom, one full bathroom, playroom & laundry area at ground floor. remodel existing kitchen, convert one (e) bathroom to two full bathrooms at 2nd floor. remove illegal structural storage shed at rear of bldg.Details
legalize two (e) bedroom, one full bathroom, playroom & laundry area at ground floor. remodel existing kitchen, convert one (e) bathroom to two full bathrooms at 2nd floor. remove illegal structural storage shed at rear of bldg. | $60,000 |
| Jun 9, 2017 | Completed final sign-off Mar 2018 | 311 Grafton Av | relocate (e) kitchen, install counter & fixture. install new electrical & lighting all work at 2nd floorDetails
relocate (e) kitchen, install counter & fixture. install new electrical & lighting all work at 2nd floor | $20,000 |
| Mar 20, 2017 | Completed final sign-off Apr 2018 | 1350 41st Av | comply with nov#199814109 & 199813703, legalize 2 bedrooms, construct 1 new bath, media room & laundry room at g/f, remodel (e) kitchen, bathroom, construct 1 bathroom & re-wire electrical lightings at 2/f, construct new deck at rear of building.Details
comply with nov#199814109 & 199813703, legalize 2 bedrooms, construct 1 new bath, media room & laundry room at g/f, remodel (e) kitchen, bathroom, construct 1 bathroom & re-wire electrical lightings at 2/f, construct new deck at rear of building. | $78,000 |
| Jan 24, 2017 | Completed final sign-off Apr 2018 | 1350 41st Av | remove sheetrock in the upstair & downstair in 2 bathroom & 1 kitchen. fix outside stair 35%.Details
remove sheetrock in the upstair & downstair in 2 bathroom & 1 kitchen. fix outside stair 35%. | $500 |
| Dec 20, 2016 | Completed final sign-off Jul 2017 | 1330 33rd Av | reroofing.Details
reroofing. | $8,500 |
| Dec 20, 2016 | Completed final sign-off Jul 2017 | 1330 33rd Av | 1. replace 5 vinyl windows & 1 vinyl sliding door in center patio; u factor >.32; 2. repair stucco in kind 100 sf; change new roofing, sep permit.Details
1. replace 5 vinyl windows & 1 vinyl sliding door in center patio; u factor >.32; 2. repair stucco in kind 100 sf; change new roofing, sep permit. | $20,000 |
| Oct 21, 2016 | Never finaled issued Nov 2016, no final | 204 Sagamore St | comply with complaint #201641771 adn 201641762. remodel extg one bathroom and rewire elect and lighting upstairs on 2nd floor.Details
comply with complaint #201641771 adn 201641762. remodel extg one bathroom and rewire elect and lighting upstairs on 2nd floor. | $14,000 |
| Sep 6, 2016 | Never finaled issued Sep 2016, no final | 204 Sagamore St | construct new deck with staircase at rear of building (size approx 19'-0"x 18'-0))Details
construct new deck with staircase at rear of building (size approx 19'-0"x 18'-0)) | $10,000 |
| Jul 11, 2016 | Completed final sign-off Jul 2019 | 2226 30th Av | horizontal rear addition 17'-0"x25'-0" to existing house. w/ (n) bedroom, (n) beth and (n) family rm.Details
horizontal rear addition 17'-0"x25'-0" to existing house. w/ (n) bedroom, (n) beth and (n) family rm. | $120,000 |
| Dec 14, 2015 | Completed final sign-off Jun 2016 | 400 Head St | 1)remodel kitchen, bath rooms, & add one new bathroom at 2nd floor. 2) construct 3 bed rooms. 2 bath room at ground floor.Details
1)remodel kitchen, bath rooms, & add one new bathroom at 2nd floor. 2) construct 3 bed rooms. 2 bath room at ground floor. | $62,000 |
| Sep 1, 2015 | Completed final sign-off Jul 2016 | 372 Stratford Dr | 1)remodel extg kitchen and 2 bath room at 2nd floor. 2)in-fill under extg bedroom at ground floor.Details
1)remodel extg kitchen and 2 bath room at 2nd floor. 2)in-fill under extg bedroom at ground floor. | $42,000 |
| May 7, 2015 | Completed final sign-off Jan 2017 | 31 Whittier St | remove/replace (e) foundation with new.Details
remove/replace (e) foundation with new. | $30,000 |
| Mar 24, 2015 | Completed final sign-off Oct 2015 | 952 Portola Dr | remodel existing kitchen, replace counters, cabinets, and fixtures. convert existing 1/2 bath into full bath, add 1 new full bath in master bedroom at 2nd flDetails
remodel existing kitchen, replace counters, cabinets, and fixtures. convert existing 1/2 bath into full bath, add 1 new full bath in master bedroom at 2nd fl | $36,000 |
| Feb 9, 2015 | Completed final sign-off Dec 2016 | 31 Whittier St | remodel (e) kitchen, two bathrooms & add one new bathroom at 2nd floor. construct two bedrooms, home office, study room, play room, laundry area, one new bathroom & legalize two bathrooms at ground floor.Details
remodel (e) kitchen, two bathrooms & add one new bathroom at 2nd floor. construct two bedrooms, home office, study room, play room, laundry area, one new bathroom & legalize two bathrooms at ground floor. | $80,000 |
| Sep 23, 2014 | Completed final sign-off Aug 2016 | 1261 32nd Av | replace existing retaining wall foundation and water heater and furnace; construct one (n) bedroom, (n) family, two(n)bathrms, one utility rm and one storage on ground floor.Details
replace existing retaining wall foundation and water heater and furnace; construct one (n) bedroom, (n) family, two(n)bathrms, one utility rm and one storage on ground floor. | $56,000 |
| Jul 8, 2014 | Completed final sign-off Nov 2014 | 2132 Ulloa St | in-fill (e) patio, remodel (e) kitchen, replace counter, cabinets & convert (e) bathroom into two bathroom. all work at second floor.Details
in-fill (e) patio, remodel (e) kitchen, replace counter, cabinets & convert (e) bathroom into two bathroom. all work at second floor. | $41,000 |
| Oct 21, 2013 | Never finaled issued Oct 2013, no final | 137 Thrift St | legalize 1 bedroom, 1 full bathroom. construct 1 bedroom, 1 full bathroom. all work at ground floor. remodel (e) kitchen. bathroom in kind at 2nd floorDetails
legalize 1 bedroom, 1 full bathroom. construct 1 bedroom, 1 full bathroom. all work at ground floor. remodel (e) kitchen. bathroom in kind at 2nd floor | $38,000 |