Back to bathroom remodel contractors
Tamura Construction Services
- Based in
- San Francisco
- On San Francisco permits
- Jan 2006 to Jun 2018
- Last 24 months
- 0 permits filed
16 permits since 2000: 14 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 534 Baker St | bathroom addition, water heater and laundry relocationDetails
bathroom addition, water heater and laundry relocation | $40,000 |
| May 17, 2016 | Completed final sign-off Nov 2016 | 875 14th St | upper unit - remodel bathroom, no structural work. replace tub, toilet, sink, skylight. new tub surround and tile floor. new bathroom fan.Details
upper unit - remodel bathroom, no structural work. replace tub, toilet, sink, skylight. new tub surround and tile floor. new bathroom fan. | $15,000 |
| Mar 16, 2016 | Completed final sign-off Nov 2020 | 321 Divisadero St | removal of failing lath & plaster in 3rd flr bathroom and se office space. install new sheetrock to comply with 1-hr fire rating requirements at exterior walls and ceiling. no structural work to comply with complaint 201600761.Details
removal of failing lath & plaster in 3rd flr bathroom and se office space. install new sheetrock to comply with 1-hr fire rating requirements at exterior walls and ceiling. no structural work to comply with complaint 201600761. | $2,000 |
| Oct 27, 2015 | Completed final sign-off Mar 2016 | 2806 Union St | unit #1: master bathroom remodel. tub/shower/vanity/toilet replacement. no structural work.Details
unit #1: master bathroom remodel. tub/shower/vanity/toilet replacement. no structural work. | $11,500 |
| Jan 26, 2010 | Completed final sign-off Mar 2010 | 473 Day St | bathroom remodel-replace bathtub, vanity, relocate toilet, relocate gfci, replace (e) light with fan/light. no structural work. provide high efficacy lights or (manual on) occupancy sensor in bathroomDetails
bathroom remodel-replace bathtub, vanity, relocate toilet, relocate gfci, replace (e) light with fan/light. no structural work. provide high efficacy lights or (manual on) occupancy sensor in bathroom | $10,000 |
| May 15, 2008 | Completed final sign-off Aug 2008 | 87 Carmel St | repair dryrot & termite damage - discovered during remodel in kind at bathroom.Details
repair dryrot & termite damage - discovered during remodel in kind at bathroom. | $37,000 |
| Mar 18, 2008 | Completed final sign-off Sep 2008 | 87 Carmel St | replace toilet, tub and sink in ex.bathroom on the 2nd floor with new ones. convert closet in bedroom on 2nd floor into a new full bathroom.Details
replace toilet, tub and sink in ex.bathroom on the 2nd floor with new ones. convert closet in bedroom on 2nd floor into a new full bathroom. | $30,000 |
| Jan 20, 2006 | Completed final sign-off Oct 2006 | 615 Belvedere St | convert 2 storage spaces to bedrooms. renovate (e) bath. voluntary seismic upgrade & fire rating of garage.Details
convert 2 storage spaces to bedrooms. renovate (e) bath. voluntary seismic upgrade & fire rating of garage. | $25,000 |