Back to bathroom remodel contractors
Tams Remodelliing
- Based in
- San Francisco
- On San Francisco permits
- Apr 2002 to Jun 2019
- Last 24 months
- 0 permits filed
24 permits since 2000: 23 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 never finaled. Typically 0 days from filing to permit and 34 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2019 | Completed final sign-off Aug 2019 | 40 Buchanan St | apartment 12: kitchen replace cabinet, counter top sink and faucet. floor tiles 5' x 8'/ bathroom replace wall tilesDetails
apartment 12: kitchen replace cabinet, counter top sink and faucet. floor tiles 5' x 8'/ bathroom replace wall tiles | $10,000 |
| Mar 28, 2019 | Completed final sign-off May 2019 | 220 Warren Dr | bathroom shower an bathtub remove all (e) wall and floor tiles, repalce 5x10 cement board sheet rock & tilesDetails
bathroom shower an bathtub remove all (e) wall and floor tiles, repalce 5x10 cement board sheet rock & tiles | $9,500 |
| Jul 10, 2018 | Completed final sign-off Sep 2018 | 1552 Sanchez St | kitchen: replace cabinet, countertop sink and floor tiles, upper and lower. bathroom: replace floor and wall tiles, vanity.Details
kitchen: replace cabinet, countertop sink and floor tiles, upper and lower. bathroom: replace floor and wall tiles, vanity. | $9,500 |
| May 4, 2018 | Completed final sign-off Jun 2018 | 77 Hermann St | unit #1 & unit # 58 - bathroom replace wall tiles only. no change of (e) floor planDetails
unit #1 & unit # 58 - bathroom replace wall tiles only. no change of (e) floor plan | $3,800 |
| Dec 29, 2014 | Completed final sign-off Jan 2015 | 1407 05th Av | bathroom replace wall tile only.Details
bathroom replace wall tile only. | $1,500 |
| Oct 21, 2014 | Completed final sign-off Nov 2014 | 4076 17th St | bathroom replace wall tiles, cement board only.Details
bathroom replace wall tiles, cement board only. | $2,000 |
| Jul 1, 2014 | Completed final sign-off Jul 2014 | 4076 17th St | bathroom replace wall tiles in unit 506Details
bathroom replace wall tiles in unit 506 | $1,100 |
| Dec 12, 2013 | Never finaled issued Dec 2013, no final | 740 Parnassus Av | unit #15: bathroom replace wall tiles & sheet rock bath tub.Details
unit #15: bathroom replace wall tiles & sheet rock bath tub. | $1,000 |
| Oct 17, 2013 | Completed final sign-off Oct 2013 | 740 Parnassus Av | unit #3:kitchen replace counter top. 5'x 20". bathroom replace wall tiles.Details
unit #3:kitchen replace counter top. 5'x 20". bathroom replace wall tiles. | $1,500 |
| Sep 11, 2013 | Completed final sign-off Aug 2014 | 265 Lee Av | to comply with his nov #201310324. remodel kitchen & bathroom, kitchen 9 x 7'6", bathroom 4x7.Details
to comply with his nov #201310324. remodel kitchen & bathroom, kitchen 9 x 7'6", bathroom 4x7. | $8,000 |
| Nov 21, 2006 | Completed final sign-off May 2007 | 1518 Innes Av | kitchen replace 5/8 drywall sheet rot. replace cabinet, counter top, tiles. bathroom replace drywall, cement board, tiles, change 6 windows in kind, 2 facing street.Details
kitchen replace 5/8 drywall sheet rot. replace cabinet, counter top, tiles. bathroom replace drywall, cement board, tiles, change 6 windows in kind, 2 facing street. | $12,500 |