Back to bathroom remodel contractors
Tamalpais Construction Company
- Based in
- Mill Valley
- On San Francisco permits
- Jan 2012 to Aug 2023
- Last 24 months
- 0 permits filed
19 permits since 2000: 11 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 3 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 12, 2023 | Expired or cancelled withdrawn Aug 2023 | 525 07th St | revision to pa# 202201316970, add urinal into previously approved bathroomDetails
revision to pa# 202201316970, add urinal into previously approved bathroom | $1,000 |
| Apr 23, 2014 | Completed final sign-off Feb 2015 | 111 27th Av | remodel including 135 sq ft of infill addition at extg garage, rebuild extg stairs at 1st and 2nd floors, remodel master bedroom and bath, reconfigure bedroom closet, and remodel 4th floor bedroom, and bathroom. new doors at rear yard ground level and new windows at rear stairwell.Details
remodel including 135 sq ft of infill addition at extg garage, rebuild extg stairs at 1st and 2nd floors, remodel master bedroom and bath, reconfigure bedroom closet, and remodel 4th floor bedroom, and bathroom. new doors at rear yard ground level and new windows at rear stairwell. | $120,000 |
| Dec 13, 2013 | Completed final sign-off Dec 2021 | 43 Topaz Wy | exterior work: (n) exterior finish "inkind", all (n) windows, (n) guardrails, (n) entry gate, re-pave driveway & walkway. interior work: remodel bathrooms, kitchenDetails
exterior work: (n) exterior finish "inkind", all (n) windows, (n) guardrails, (n) entry gate, re-pave driveway & walkway. interior work: remodel bathrooms, kitchen | $550,000 |
| Oct 10, 2013 | Completed final sign-off Jan 2014 | 1250 Washington St | renovate 2 bathrooms with new fixtures & tile, no location changes. no change in wall and opening layout, bathroom lighting shall be high efficacy or controlled by manual on sensors.Details
renovate 2 bathrooms with new fixtures & tile, no location changes. no change in wall and opening layout, bathroom lighting shall be high efficacy or controlled by manual on sensors. | $15,000 |
| Jul 15, 2013 | Completed final sign-off Jan 2014 | 257 Castro St | attic space remodel -add non structural walls on top floor, install new bathroom, closets & master bedroomDetails
attic space remodel -add non structural walls on top floor, install new bathroom, closets & master bedroom | $82,071 |
| Mar 28, 2013 | Never finaled filed Mar 2013, never issued | 773 Pine St | kitchen & bathroom renovation w/out moving electrical/plumbing. no change on walls. unit #773a, 773, 775, 777 pine street.Details
kitchen & bathroom renovation w/out moving electrical/plumbing. no change on walls. unit #773a, 773, 775, 777 pine street. | $150,000 |
| Jan 3, 2013 | Completed final sign-off Jul 2013 | 1770 Pacific Av | kitchen and bath remodel at 2nd floor unit 101; wall changes with new pocket doors at non load bearing walls.Details
kitchen and bath remodel at 2nd floor unit 101; wall changes with new pocket doors at non load bearing walls. | $110,000 |
| Jan 24, 2012 | Completed final sign-off Oct 2013 | 101 27th Av | revision to 201109275610- replace 2nd fl bay on east facade with balcony. close and open new windows per plan. replace exsting exterior finish materials per elevation. add 3rd fl bath. expand storage space on gr floorDetails
revision to 201109275610- replace 2nd fl bay on east facade with balcony. close and open new windows per plan. replace exsting exterior finish materials per elevation. add 3rd fl bath. expand storage space on gr floor | $5,000 |