Back to bathroom remodel contractors
Talior Construction Inc.
- Based in
- Berkeley
- On San Francisco permits
- Dec 2020 to Aug 2026
- Last 24 months
- 4 permits filed
12 permits since 2000: 3 completed, 4 in progress, 5 never finaled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 2 completed, 2 in progress, 4 never finaled. Typically 7 days from filing to permit and 410 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 9, 2026 | In progress issued Jun 2026 | 783 31st Av | demolish concrete slab on back portion of 1st floor (garage slab to remain). including building seismic upgrade and residential interior remodel including kitchen and bathroomDetails
demolish concrete slab on back portion of 1st floor (garage slab to remain). including building seismic upgrade and residential interior remodel including kitchen and bathroom | $150,000 |
| Oct 3, 2025 | In progress issued Oct 2025 | 783 31st Av | primary bathrom remodel in kind - replace toilet, vanity, new tile on shower floors and walls. install ceiling fan. hallway bath remodel in kind - replace toilet, vanity, new tile on floors, shower walls and showerpan to showerpan. install ceiling fan. no structural work,no wall removal,no new wall.Details
primary bathrom remodel in kind - replace toilet, vanity, new tile on shower floors and walls. install ceiling fan. hallway bath remodel in kind - replace toilet, vanity, new tile on floors, shower walls and showerpan to showerpan. install ceiling fan. no structural work,no wall removal,no new wall. | $50,000 |
| Feb 14, 2024 | Completed final sign-off Oct 2024 | 3739 Webster St | kitchen remodel master bath remodel, hallway bath remodel, 2 skylightsDetails
kitchen remodel master bath remodel, hallway bath remodel, 2 skylights | $150,000 |
| Mar 24, 2022 | Never finaled issued Mar 2022, no final | 1458 14th Av | unit2: remove subpanel from closet/install new at hallway. kitchen remodel: like to like. install vinyl floors, cabinets, countertops, back splash, sink, dishwasher. bathroom: like to like, install ceiling vent, vinyl floors. refinish (e) hardwood floors. electrical/plumbing upgrade as needed.Details
unit2: remove subpanel from closet/install new at hallway. kitchen remodel: like to like. install vinyl floors, cabinets, countertops, back splash, sink, dishwasher. bathroom: like to like, install ceiling vent, vinyl floors. refinish (e) hardwood floors. electrical/plumbing upgrade as needed. | $40,000 |
| Jul 6, 2021 | Never finaled issued Jul 2021, no final | 63 Marietta Dr | 1st fl: to legalize half bath, add family room. repair dry wall, add new window at rear. revision to 2020 1216 1122.Details
1st fl: to legalize half bath, add family room. repair dry wall, add new window at rear. revision to 2020 1216 1122. | $45,000 |
| Mar 15, 2021 | Never finaled issued May 2021, no final | 63 Marietta Dr | revision to pa# 202012161122. reconfigre bathroom layout and new fireplace.Details
revision to pa# 202012161122. reconfigre bathroom layout and new fireplace. | |
| Dec 18, 2020 | Completed final sign-off Aug 2022 | 843 33rd Av | second floor kitchen remodel and bathroom. no change on layout and wallsDetails
second floor kitchen remodel and bathroom. no change on layout and walls | $18,000 |
| Dec 16, 2020 | Never finaled issued Dec 2020, no final | 63 Marietta Dr | kitchen remodel like for like. lower floor bathroom remodel like for like. main floor bathroom remodel: remove extg bathtub, toilet and vanity complete remodeling. gym room: remove wood panaling, install insulation, drywall and cabinets. install furnace in basement.Details
kitchen remodel like for like. lower floor bathroom remodel like for like. main floor bathroom remodel: remove extg bathtub, toilet and vanity complete remodeling. gym room: remove wood panaling, install insulation, drywall and cabinets. install furnace in basement. | $80,000 |