Back to bathroom remodel contractors
Tai Shan Construction
- Based in
- Millbrae
- On San Francisco permits
- Feb 2000 to Apr 2023
- Last 24 months
- 0 permits filed
36 permits since 2000: 34 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 17 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2017 | Completed final sign-off Jul 2018 | 2349 26th Av | comply w/ nov #201785901. legalize dwelling unit (unit b) on 1st fl by legalized as built kitchen per plan. unit included (2) bedroom, (2) bathrooms, living room & kitchen per unit legalization ordinace# 43-14Details
comply w/ nov #201785901. legalize dwelling unit (unit b) on 1st fl by legalized as built kitchen per plan. unit included (2) bedroom, (2) bathrooms, living room & kitchen per unit legalization ordinace# 43-14 | $20,000 |
| Jan 12, 2017 | Completed final sign-off Jun 2017 | 201 Holloway Av | remodel kitchen & bathroom. like for like. no change to wall locations or addition of new walls.Details
remodel kitchen & bathroom. like for like. no change to wall locations or addition of new walls. | $34,000 |
| Sep 30, 2016 | Completed final sign-off Nov 2016 | 838 Anza St | unit 201: replace sink, faucet, tile floor, bath, toilet; no walls moved/removed/added/infilled; all (e) layouts to remain unchanged.Details
unit 201: replace sink, faucet, tile floor, bath, toilet; no walls moved/removed/added/infilled; all (e) layouts to remain unchanged. | $3,000 |
| May 30, 2014 | Completed final sign-off Nov 2014 | 1845 Judah St | new bedroom & two bathrooms @ 1st floor. new fence at rear yard.Details
new bedroom & two bathrooms @ 1st floor. new fence at rear yard. | $26,000 |
| Apr 9, 2012 | Completed final sign-off Jun 2012 | 138 Beaumont Av | remodel kitchen & bathroom. lighting will comply w/t-24.Details
remodel kitchen & bathroom. lighting will comply w/t-24. | $5,000 |
| Aug 12, 2011 | Completed final sign-off Oct 2011 | 3022 Octavia St | remodel the bathroom, change sink, toilet and bath tub at 3rd floor. no new lighting. no structural work.Details
remodel the bathroom, change sink, toilet and bath tub at 3rd floor. no new lighting. no structural work. | $5,000 |
| Mar 11, 2011 | Completed final sign-off Jun 2011 | 25 Wayne Pl | work to be done at 25 wayne place: remodel bathroom - replace fixtures. no relocation of any fixtures. remodel kitchen less than 50% repair, replace fixtures/cabinets. no relocation of any fixtures. repair and pain rear stairway (portions). replace windows.Details
work to be done at 25 wayne place: remodel bathroom - replace fixtures. no relocation of any fixtures. remodel kitchen less than 50% repair, replace fixtures/cabinets. no relocation of any fixtures. repair and pain rear stairway (portions). replace windows. | $20,000 |
| Dec 24, 2009 | Completed final sign-off Dec 2010 | 2275 35th Av | add new bedrooms and bathrooms at first floor.Details
add new bedrooms and bathrooms at first floor. | $30,000 |
| Jul 24, 2009 | Completed final sign-off Jan 2010 | 2347 26th Av | legalize (e) bath room and family room. add two bedrooms and bath room on first floor as per plan.Details
legalize (e) bath room and family room. add two bedrooms and bath room on first floor as per plan. | $56,000 |
| Mar 26, 2009 | Completed final sign-off Jul 2009 | 554 25th Av | work at unit 554: legalize existing bathroom and new sink in social room at 1st floorDetails
work at unit 554: legalize existing bathroom and new sink in social room at 1st floor | $10,900 |
| Nov 24, 2008 | Expired or cancelled cancelled Aug 2022 | 2239 37th Av | to comply w/ nov 200873034, add one bathroom at2nd fl.Details
to comply w/ nov 200873034, add one bathroom at2nd fl. | $3,000 |
| Sep 19, 2008 | Completed final sign-off Jan 2009 | 2239 37th Av | new family room and laundry area to be constructed at ground floor. replace (e) rear window with new. relocate full bath next to stairs at g/f, see complaint #200873034.Details
new family room and laundry area to be constructed at ground floor. replace (e) rear window with new. relocate full bath next to stairs at g/f, see complaint #200873034. | $28,000 |
| Apr 4, 2007 | Completed final sign-off Nov 2007 | 576 Bowdoin St | remodel the bathroom.one bathroom new sink to comply with nov 200796883. new toilet repair damage portion of garage door at bottom. repair defected wall finish i bedroom and paint for previously complaint wit nov#200796883/200796956Details
remodel the bathroom.one bathroom new sink to comply with nov 200796883. new toilet repair damage portion of garage door at bottom. repair defected wall finish i bedroom and paint for previously complaint wit nov#200796883/200796956 | $9,000 |
| Feb 26, 2007 | Completed final sign-off Jun 2007 | 1635 Plymouth Av | remodel the bathroom one bathroom: new sink, toilet, jacuzzi @ 2nd floor.Details
remodel the bathroom one bathroom: new sink, toilet, jacuzzi @ 2nd floor. | $5,000 |
| Oct 2, 2006 | Completed final sign-off Jan 2007 | 1600 Lombard St | remodel the 1 kitchen and 1 bathroom. no structural work.Details
remodel the 1 kitchen and 1 bathroom. no structural work. | $10,000 |
| Oct 2, 2006 | Completed final sign-off Dec 2006 | 150 Seal Rock Dr | remodel the kitchen and bathroom. replace cabinets, countertops, wall and floor tile.Details
remodel the kitchen and bathroom. replace cabinets, countertops, wall and floor tile. | $5,000 |
| Jun 23, 2006 | Completed final sign-off Aug 2007 | 1675 21st Av | basement renovation; (n) bath 2 , (n) bedrm, (n) study, (n) failyroom, (n)playrm, new partition non bearing walls built on existing slabDetails
basement renovation; (n) bath 2 , (n) bedrm, (n) study, (n) failyroom, (n)playrm, new partition non bearing walls built on existing slab | $30,000 |
| Nov 13, 2003 | Completed final sign-off Jun 2004 | 1295 38th Av | remodel two kitchen and two bathroomsDetails
remodel two kitchen and two bathrooms | $20,000 |