Back to bathroom remodel contractors
T T General Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2010 to Sep 2026
- Last 24 months
- 7 permits filed
60 permits since 2000: 54 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 25 completed, 1 in progress. Typically 32 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2026 | Completed final sign-off May 2026 | 503 Hugo St | g/f -convert (e) closet to half bath, replace 1 rear facing window in e) openingDetails
g/f -convert (e) closet to half bath, replace 1 rear facing window in e) opening | $14,000 |
| Oct 9, 2025 | In progress issued Mar 2026 | 1470 De Haro St | expand level 1 to create new conditioned space at level 1, and enlarge level 2 bathroomDetails
expand level 1 to create new conditioned space at level 1, and enlarge level 2 bathroom | $55,000 |
| Nov 25, 2024 | Completed final sign-off Jun 2025 | 3948 Mission St | rev 202410092657- add utlitiy sink and remove structural scope of work at facade. reduce size of bathroom window. remove shearwall and holdown special inspections from pa#2024-1009-2657Details
rev 202410092657- add utlitiy sink and remove structural scope of work at facade. reduce size of bathroom window. remove shearwall and holdown special inspections from pa#2024-1009-2657 | |
| Jan 6, 2023 | Completed final sign-off Jan 2023 | 366 Chenery St | revision to pa#202102134653. change to backyard fence height and new 29" retaining wall. change to mudroom/wc/storage layout, & single faucet at master bath. no shower at 3rd floor bath. square off landin at back yard stairs. no new trash enclosureDetails
revision to pa#202102134653. change to backyard fence height and new 29" retaining wall. change to mudroom/wc/storage layout, & single faucet at master bath. no shower at 3rd floor bath. square off landin at back yard stairs. no new trash enclosure | |
| Nov 3, 2022 | Completed final sign-off Jan 2025 | 64 Divisadero St | convert unfinished 1st floor to living space, incl, 2 new bedrooms + hall bath convert (e) bedroom in to new dining room and 2nd flr remodel (e) 2nd floor bathrm. new int stair @ existing light well. no work on 3rd and 4th flrsDetails
convert unfinished 1st floor to living space, incl, 2 new bedrooms + hall bath convert (e) bedroom in to new dining room and 2nd flr remodel (e) 2nd floor bathrm. new int stair @ existing light well. no work on 3rd and 4th flrs | $200,000 |
| May 27, 2022 | Completed final sign-off Jan 2024 | 218 Miguel St | 1st fl - remodeling including new family room, bath and bedroom; replace (e) brick foundationDetails
1st fl - remodeling including new family room, bath and bedroom; replace (e) brick foundation | $175,000 |
| Mar 30, 2021 | Completed final sign-off Mar 2022 | 720 03rd Av | 3/f: hall bath and bedroom closets remodel, new master bath. 2/f: kitchen, vestibule and half bath remodel.Details
3/f: hall bath and bedroom closets remodel, new master bath. 2/f: kitchen, vestibule and half bath remodel. | $115,000 |
| Feb 13, 2021 | Completed final sign-off Jan 2023 | 366 Chenery St | first floor:install garbage enclosure. new garage door. 2nd floor: convert floor to living space, including new master suite, office, family room, and storage. new uncond. mech closet and laundry room. new front entry porch. 3rd floor: gut remodel including kitchen, new bathroom & new deck at grade.Details
first floor:install garbage enclosure. new garage door. 2nd floor: convert floor to living space, including new master suite, office, family room, and storage. new uncond. mech closet and laundry room. new front entry porch. 3rd floor: gut remodel including kitchen, new bathroom & new deck at grade. | $350,000 |
| Jan 3, 2020 | Completed final sign-off Jun 2020 | 3950 Mission St | remodeling 1 bath and 1 kitchen at 2nd fl. no structural work.Details
remodeling 1 bath and 1 kitchen at 2nd fl. no structural work. | $15,000 |
| Dec 12, 2019 | Completed final sign-off Jan 2021 | 351 27th St | interior remodel of kitchen, living, dining, bath, closetsDetails
interior remodel of kitchen, living, dining, bath, closets | $65,000 |
| Apr 18, 2019 | Completed final sign-off Dec 2019 | 53 Stillings Av | 2nd flr - kitchen & bathroom remodel, including new skylights. 1st flr - conversion of 787 sf of garage/storage to conditioned space, including new master suite, den, storage, laundry room and interior stairsDetails
2nd flr - kitchen & bathroom remodel, including new skylights. 1st flr - conversion of 787 sf of garage/storage to conditioned space, including new master suite, den, storage, laundry room and interior stairs | $175,000 |
| Dec 13, 2018 | Completed final sign-off Dec 2019 | 200 Madrid St | convert 666sf of unconditioned 1st fl storage space into living space including remodeling an (e) 1/2 bath. reclaim 28sf of entry recess as (n) conditioned space. relocate (e) furnace & w/h to basement. rpelace most windows & doors. remodel (e) kitchen & bath on 2nd fl. replacing fixtures in kind.Details
convert 666sf of unconditioned 1st fl storage space into living space including remodeling an (e) 1/2 bath. reclaim 28sf of entry recess as (n) conditioned space. relocate (e) furnace & w/h to basement. rpelace most windows & doors. remodel (e) kitchen & bath on 2nd fl. replacing fixtures in kind. | $125,000 |
| May 9, 2018 | Completed final sign-off Jul 2018 | 245 Dolores St | remodel one kitchen, replace cabinets, counters & floor. at least 50% high efficiency lighting (by wattage). remodel one bathroom in same location. no walls moved, removed added or in-filled. all (e) layouts to remain unchanged.Details
remodel one kitchen, replace cabinets, counters & floor. at least 50% high efficiency lighting (by wattage). remodel one bathroom in same location. no walls moved, removed added or in-filled. all (e) layouts to remain unchanged. | $32,810 |
| Nov 9, 2017 | Completed final sign-off Mar 2018 | 218 Miguel St | remodel one bathroom in-kind, same location, new lights with occupancy sensorswitches use (e) fan.Details
remodel one bathroom in-kind, same location, new lights with occupancy sensorswitches use (e) fan. | $12,000 |
| Jun 19, 2017 | Completed final sign-off Mar 2018 | 566 Chenery St | 1st fl new bath, remove (e) 2nd bath, new exterior door at bedroom 2. 2nd fl new kitchen, living and dining rm. replace in kind exterior windows & doors, not visible from the street. work as indicated on condo conversion reportDetails
1st fl new bath, remove (e) 2nd bath, new exterior door at bedroom 2. 2nd fl new kitchen, living and dining rm. replace in kind exterior windows & doors, not visible from the street. work as indicated on condo conversion report | $130,000 |
| Nov 15, 2016 | Completed final sign-off Dec 2018 | 152 Santa Marina St | (n) 153 sq ft 3rd fl master bath, landing & closet addition. (n) 142 sq ft roof deck off of master bath, including (n) guardrail. no change to street facade.Details
(n) 153 sq ft 3rd fl master bath, landing & closet addition. (n) 142 sq ft roof deck off of master bath, including (n) guardrail. no change to street facade. | $75,000 |
| Jul 22, 2015 | Completed final sign-off Jan 2019 | 2151 Scott St | interior renovation: 1st flr: convert unconditioned to fam room & bath. enlcose entry foyer. 2nd flr: remodel entire flr - kitchen, bath & add powder rm/ 3rd flr: convert 2 bedrms to master & new baths, new skylights, windows, reconfigure (e) stair.Details
interior renovation: 1st flr: convert unconditioned to fam room & bath. enlcose entry foyer. 2nd flr: remodel entire flr - kitchen, bath & add powder rm/ 3rd flr: convert 2 bedrms to master & new baths, new skylights, windows, reconfigure (e) stair. | $117,000 |
| May 18, 2015 | Completed final sign-off Sep 2015 | 45 Ora Wy | 1st floor/unit a101: kitchen remodel/bath remodel: new interior finishes @ bedroom & living room, minor partition changesDetails
1st floor/unit a101: kitchen remodel/bath remodel: new interior finishes @ bedroom & living room, minor partition changes | $30,000 |
| Jul 31, 2014 | Completed final sign-off May 2016 | 3303 Folsom St | revision to appl #2014.0321.1414 - convert from 1 dwelling unit to 2 dwelling units (floors 1&2 one unit, floors 3 & 4 second unit). new bathroom on 1st floor, new kitchen, remove int stair on 2nd floor. change sprinklers to nfpa 13.Details
revision to appl #2014.0321.1414 - convert from 1 dwelling unit to 2 dwelling units (floors 1&2 one unit, floors 3 & 4 second unit). new bathroom on 1st floor, new kitchen, remove int stair on 2nd floor. change sprinklers to nfpa 13. | $20,000 |
| Jul 25, 2014 | Completed final sign-off Nov 2015 | 550 Mississippi St | a demolition of an (e) 2nd floor deck and construction of a new horizontal addition containing a stairway, family room and new deck. addition of a new bedroom and bathroom within (e) non conditioned space.Details
a demolition of an (e) 2nd floor deck and construction of a new horizontal addition containing a stairway, family room and new deck. addition of a new bedroom and bathroom within (e) non conditioned space. | $153,000 |
| Mar 5, 2014 | Completed final sign-off Apr 2015 | 75 Ora Wy | unit #d105 - remodel kitchen and bathroom, remove fire place, modify closetDetails
unit #d105 - remodel kitchen and bathroom, remove fire place, modify closet | $20,000 |
| Jun 7, 2013 | Completed final sign-off Jan 2014 | 933 20th St | build out (e) commercial space, reception area, bathrooms, offices, work area & lighting. legalize (e) mezzanine, relocate stairs, apply fireproofing to mezz decking. separate permits required for fire alarm, sprinklers, mep. no kitchen under this permit. approved otc. jjcDetails
build out (e) commercial space, reception area, bathrooms, offices, work area & lighting. legalize (e) mezzanine, relocate stairs, apply fireproofing to mezz decking. separate permits required for fire alarm, sprinklers, mep. no kitchen under this permit. approved otc. jjc | $160,000 |
| May 22, 2013 | Completed final sign-off Aug 2013 | 1099 23rd St | remodel & extnd master bathrm, replace all fixtures, new flooring, relocate subpanel. relocate gas hookup in laudnry room & new flooring at lower floor at lower floor entrance. remodel kitchen include nw 220v circuit for oven & nw flrg. remodel 1/2 bath. replace all fixtures new floor at half bath.Details
remodel & extnd master bathrm, replace all fixtures, new flooring, relocate subpanel. relocate gas hookup in laudnry room & new flooring at lower floor at lower floor entrance. remodel kitchen include nw 220v circuit for oven & nw flrg. remodel 1/2 bath. replace all fixtures new floor at half bath. | $80,000 |
| Oct 19, 2012 | Completed final sign-off Nov 2012 | 80 Ora Wy | remodel one bathroom in kind same location, new light with occupancy sensor switch, use existing exhaust fanDetails
remodel one bathroom in kind same location, new light with occupancy sensor switch, use existing exhaust fan | $6,000 |
| Feb 16, 2011 | Completed final sign-off Apr 2011 | 75 Ora Wy | remodel condo unit in a multi family bldg. unit d106 on the 1st floor. remodel full bathroom, minor non load bearing partition changes. elec and lighting in bedroom and hallDetails
remodel condo unit in a multi family bldg. unit d106 on the 1st floor. remodel full bathroom, minor non load bearing partition changes. elec and lighting in bedroom and hall | $15,000 |
| Jul 13, 2010 | Completed final sign-off Oct 2010 | 1628 Alemany Bl | remodel one kitchen,add 2 full bathrooms (1 in garage &1 in bsmnt) and one half bath on main/2nd floor,replace one furnace, build a wall btn garage and living space.new storage rm in bsmnt. legalize 2 bedrooms on ground fl.replace 2 windows at rear in main floor bedrms,new rear deck 6'x18',new drsDetails
remodel one kitchen,add 2 full bathrooms (1 in garage &1 in bsmnt) and one half bath on main/2nd floor,replace one furnace, build a wall btn garage and living space.new storage rm in bsmnt. legalize 2 bedrooms on ground fl.replace 2 windows at rear in main floor bedrms,new rear deck 6'x18',new drs | $32,000 |