Back to bathroom remodel contractors
T M K Builders Inc
- Based in
- Penngrove
- On San Francisco permits
- May 2013 to Sep 2018
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 64 days from filing to permit and 245 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2016 | Completed final sign-off Sep 2016 | 3026 Pacheco St | revision to pa 2014-0530-7170, change footing from 3 sided to 2 sided for (n) bathroom in the officeDetails
revision to pa 2014-0530-7170, change footing from 3 sided to 2 sided for (n) bathroom in the office | |
| May 30, 2014 | Completed final sign-off Sep 2016 | 3026 Pacheco St | add bathroom to existing office on the ground floor. change cabinet at existing kitchen. change floor at 2nd fl. replace windows for double pane windows. update electrical at kitchen, dining rm, and bath, new subpanel of 50 am at garage, interior paintDetails
add bathroom to existing office on the ground floor. change cabinet at existing kitchen. change floor at 2nd fl. replace windows for double pane windows. update electrical at kitchen, dining rm, and bath, new subpanel of 50 am at garage, interior paint | $30,000 |
| May 8, 2013 | Completed final sign-off Mar 2014 | 294 Upper Tr | remodel (e) master bedroom,closet. replace partition of (e) interior stair. remove fire place. reconfigure closet for laundry closet per plan. new lighting in (e) livingroom (e) master bedroom, (e) master bath, (e) master closet.Details
remodel (e) master bedroom,closet. replace partition of (e) interior stair. remove fire place. reconfigure closet for laundry closet per plan. new lighting in (e) livingroom (e) master bedroom, (e) master bath, (e) master closet. | $40,000 |