Back to bathroom remodel contractors
T M C Construction
- Based in
- Mill Valley
- On San Francisco permits
- Jan 2001 to Mar 2010
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 expired or cancelled. Typically 119 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2006 | Expired or cancelled expired May 2008 | 2465 Union St | study room added in basement with bathroom at use unoccupied u floor area < 300 sq ft. new windows on front.Details
study room added in basement with bathroom at use unoccupied u floor area < 300 sq ft. new windows on front. | $49,000 |