Back to bathroom remodel contractors
T & M Builders
- Based in
- San Rafael
- On San Francisco permits
- Aug 2008 to Aug 2011
- Last 24 months
- 0 permits filed
10 permits since 2000: 7 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 21 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 30, 2011 | Expired or cancelled expired May 2013 | 1001 Pine St | unit #903 - remodel 1 kitchen & 1 bathroom, install doors & trim, cabinets & vanity, including tile work, sheetrock to unit interior walls, no change to windows walls or doors, lighting to comply with cec 150 (k), all accessable features in (e) unit shall be maintained, no mechanical work involved.Details
unit #903 - remodel 1 kitchen & 1 bathroom, install doors & trim, cabinets & vanity, including tile work, sheetrock to unit interior walls, no change to windows walls or doors, lighting to comply with cec 150 (k), all accessable features in (e) unit shall be maintained, no mechanical work involved. | $30,000 |
| Jun 30, 2011 | Completed final sign-off Jul 2011 | 30 Divisadero St | comply with nov 200666267, order of abatement.revision to app#200602134536 to legalize extg. bath on ground floor.Details
comply with nov 200666267, order of abatement.revision to app#200602134536 to legalize extg. bath on ground floor. | |
| Apr 16, 2010 | Completed final sign-off May 2010 | 2482 Bush St | bathroom remodel. replace beth tub, tile, vanity, toilet, lighting. provide high eff lights or manual on motion sensor in bathDetails
bathroom remodel. replace beth tub, tile, vanity, toilet, lighting. provide high eff lights or manual on motion sensor in bath | $12,677 |
| Oct 7, 2008 | Completed final sign-off Sep 2009 | 6 Mountview Ct | legalize downstairs area. raise dropped ceiling to 7'6". build new partition wall (fire rated) with fire rated door. demo door to bedroom #1 and add exterior door. gfci plugs and flourescent lights in bathroom. add lights at exterior doors. demo wet bar. install new fau and feeder ductsDetails
legalize downstairs area. raise dropped ceiling to 7'6". build new partition wall (fire rated) with fire rated door. demo door to bedroom #1 and add exterior door. gfci plugs and flourescent lights in bathroom. add lights at exterior doors. demo wet bar. install new fau and feeder ducts | $12,000 |