Back to bathroom remodel contractors
T H Eller Construction
- Based in
- Woodacre
- On San Francisco permits
- Oct 2001 to Jun 2015
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2015 | Completed final sign-off Nov 2015 | 526 Pacheco St | 1. kitchen remodel - replace flooring, replace cabinets, replace plumbing fixtures at kitchen sink. install stove, install built in refrigerator, relocate (e) electrical outlets, install 3 new elec outlets. 2. re-tile bath tub/shower at main floor bathroom.Details
1. kitchen remodel - replace flooring, replace cabinets, replace plumbing fixtures at kitchen sink. install stove, install built in refrigerator, relocate (e) electrical outlets, install 3 new elec outlets. 2. re-tile bath tub/shower at main floor bathroom. | $80,000 |
| Aug 1, 2006 | Completed final sign-off May 2007 | 950 Columbus Av | kitchen remodel new carbinets, appliance location to remain. master bath, new tile @ tub shower new vanity new toilet.no structural work.Details
kitchen remodel new carbinets, appliance location to remain. master bath, new tile @ tub shower new vanity new toilet.no structural work. | $55,000 |