Back to bathroom remodel contractors
T Baker Construction Inc.
- Based in
- Larkspur
- On San Francisco permits
- Jan 2000 to Jan 2010
- Last 24 months
- 0 permits filed
99 permits since 2000: 58 completed, 6 never finaled, 35 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 15 completed, 4 expired or cancelled. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2009 | Completed final sign-off Dec 2009 | 2674 Filbert St | interior remodel to include replacing and minor revision to existing stairway from entry level to lower level. add new bathroom on the upper level. new pocket door between kitchen and living room. new french doors to (e) rear balcony to replace existing door and window.Details
interior remodel to include replacing and minor revision to existing stairway from entry level to lower level. add new bathroom on the upper level. new pocket door between kitchen and living room. new french doors to (e) rear balcony to replace existing door and window. | $50,000 |
| Jun 29, 2009 | Completed final sign-off Sep 2009 | 1958 Vallejo St | replace fixtures in 3 (e) bathrooms. new closet, shelving, no structural changes, fixtures to include 3 water closets & 2 vanity sinks. no lighting work, no new exhaust ductsDetails
replace fixtures in 3 (e) bathrooms. new closet, shelving, no structural changes, fixtures to include 3 water closets & 2 vanity sinks. no lighting work, no new exhaust ducts | $6,000 |
| May 6, 2009 | Completed final sign-off Dec 2009 | 2674 Filbert St | replace fixtures + finishes in kitchen + 2 baths on second floor. no exterior changes. no removal of wall. replace countertop, appliance, sink, lighting, elec. upgrade. in kitchen ~11'15'. bathroom ~ 6'x10' each. replace vanitys, toiledts, showers, flooring, lighting 50% light watt in kitchen h.eDetails
replace fixtures + finishes in kitchen + 2 baths on second floor. no exterior changes. no removal of wall. replace countertop, appliance, sink, lighting, elec. upgrade. in kitchen ~11'15'. bathroom ~ 6'x10' each. replace vanitys, toiledts, showers, flooring, lighting 50% light watt in kitchen h.e | $53,248 |
| Sep 24, 2008 | Completed final sign-off Mar 2009 | 239 Mallorca Wy | revision to pa# 2008-0812-8976-remove non-bearing partition wall between 2 (e) 2nd floor bathrooms and combine into one bathroom. relocate (e) non-bearing wall in bedroom to increase closet size. no structural or exterior changesDetails
revision to pa# 2008-0812-8976-remove non-bearing partition wall between 2 (e) 2nd floor bathrooms and combine into one bathroom. relocate (e) non-bearing wall in bedroom to increase closet size. no structural or exterior changes | $1,000 |
| Aug 12, 2008 | Completed final sign-off Mar 2009 | 239 Mallorca Wy | replace fixtures & finish in 2 baths in 2nd floor. no structural. no exterior changes. all lighting to conform to current title 24. occupancy sensors to be installed. (bathroom remodel only.)Details
replace fixtures & finish in 2 baths in 2nd floor. no structural. no exterior changes. all lighting to conform to current title 24. occupancy sensors to be installed. (bathroom remodel only.) | $8,000 |
| Aug 7, 2008 | Completed final sign-off Oct 2009 | 174 29th Av | replace cabinet , fixtures&finishes in kitchen & 2 2nd floor baths. no structural or exterior changes. any new lights to conform to current title 24 requirements. kitchen listing at least 50% in wattage flourescent. baths or occupancy sensors.Details
replace cabinet , fixtures&finishes in kitchen & 2 2nd floor baths. no structural or exterior changes. any new lights to conform to current title 24 requirements. kitchen listing at least 50% in wattage flourescent. baths or occupancy sensors. | $40,000 |
| Apr 14, 2008 | Completed final sign-off May 2009 | 999 Green St | alterations to include kitchen and 2 baths. replace extg glazing with new insulated units. extend area of living room into balcony per plans providedDetails
alterations to include kitchen and 2 baths. replace extg glazing with new insulated units. extend area of living room into balcony per plans provided | $90,000 |
| Apr 3, 2008 | Completed final sign-off Oct 2008 | 827 Marina Bl | replace fixtures and finishes in kitchen and 2 bathrooms on the second floor. no structural changes. no exterior changes. electrical work to conform to correct title 24 requirements.Details
replace fixtures and finishes in kitchen and 2 bathrooms on the second floor. no structural changes. no exterior changes. electrical work to conform to correct title 24 requirements. | $35,000 |
| Feb 27, 2007 | Expired or cancelled expired Jul 2010 | 1720 Lake St | remodel existing ground floor at rear. remodel (e) bath, change (e) layout of interior walls. to replace (e) windows in kind, as shown.Details
remodel existing ground floor at rear. remodel (e) bath, change (e) layout of interior walls. to replace (e) windows in kind, as shown. | $35,000 |
| Oct 16, 2006 | Completed final sign-off Apr 2007 | 1720 Lake St | reconfigure 2 baths on 1st floor per plans.Details
reconfigure 2 baths on 1st floor per plans. | $25,000 |
| Jun 26, 2006 | Completed final sign-off Oct 2006 | 2224 Sacramento St | upgrade plumbing & electrical-top floor, office/bath. no structural changes. no exterior changes. replace fixtures & finishes.Details
upgrade plumbing & electrical-top floor, office/bath. no structural changes. no exterior changes. replace fixtures & finishes. | $8,000 |
| May 4, 2005 | Expired or cancelled expired Nov 2006 | 2204 Green St | replace fixtures & finishes in 3 fixture bath lower level. no structural or exterior changes. add flDetails
replace fixtures & finishes in 3 fixture bath lower level. no structural or exterior changes. add fl | $7,000 |
| Jun 16, 2003 | Completed final sign-off Dec 2003 | 1941 Webster St | replace fixtures & finishes in kitchen, master bath & hall bath alterations, close two windows & chaDetails
replace fixtures & finishes in kitchen, master bath & hall bath alterations, close two windows & cha | $22,000 |
| May 21, 2003 | Completed final sign-off Dec 2003 | 1941 Webster St | add new bathroom on top floor & create more storage for office per plans provided, install nonbearinDetails
add new bathroom on top floor & create more storage for office per plans provided, install nonbearin | $13,000 |
| May 14, 2003 | Completed final sign-off Nov 2003 | 2209 North Point St | install non-bearing partition- in basement office/game room & remodel at bath per plans providedDetails
install non-bearing partition- in basement office/game room & remodel at bath per plans provided | $15,000 |
| Sep 11, 2002 | Completed final sign-off Jun 2003 | 3030 Washington St | alter storage area in basement level;create home office/fam rm & bath,all work w/in (e)envelopeDetails
alter storage area in basement level;create home office/fam rm & bath,all work w/in (e)envelope | $50,000 |
| Jul 15, 2002 | Expired or cancelled expired Oct 2003 | 2590 Pine St | revise 2001/04/12/6725.chg liv-rm to kitchen, closet & widow & door at bathroom hallway at basement.Details
revise 2001/04/12/6725.chg liv-rm to kitchen, closet & widow & door at bathroom hallway at basement. | $2,500 |
| Apr 9, 2002 | Expired or cancelled expired Apr 2004 | 2741 Vallejo St | revision 200005230793 2741 vallejo st addition of 4 1 hr rated at prop line, move 1 bath,add 1 bathDetails
revision 200005230793 2741 vallejo st addition of 4 1 hr rated at prop line, move 1 bath,add 1 bath | $10,000 |
| Jan 25, 2000 | Completed final sign-off Jun 2000 | 2636 Vallejo St | replace fixtures & finishes in kitchen & 2nd floor bathroomDetails
replace fixtures & finishes in kitchen & 2nd floor bathroom |