Back to bathroom remodel contractors
T Baker Construction
- Based in
- Larkspur
- On San Francisco permits
- Oct 2006 to Sep 2007
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2007 | Completed final sign-off Jan 2008 | 2668 Vallejo St | replace fixture and finishes in 2nd floor bath. no structural or exterior changes. bath tub lighting and switches to conform to title 24Details
replace fixture and finishes in 2nd floor bath. no structural or exterior changes. bath tub lighting and switches to conform to title 24 | $8,000 |
| Oct 19, 2006 | Completed final sign-off Feb 2007 | 1059 Noe St | install new bathroom in existing sitting room. replace fixtures and finsihes in bath #1 and 1st floor powder room per plans. only fixture replacementDetails
install new bathroom in existing sitting room. replace fixtures and finsihes in bath #1 and 1st floor powder room per plans. only fixture replacement | $15,000 |