Back to bathroom remodel contractors
Swift Construction
- Based in
- San Mateo
- On San Francisco permits
- May 2013 to Nov 2025
- Last 24 months
- 4 permits filed
11 permits since 2000: 9 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 61 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2025 | Completed final sign-off Dec 2025 | 364 Eddy St | 4th fl: bathroom remodel:replace tub with stall shower.Details
4th fl: bathroom remodel:replace tub with stall shower. | $25,000 |
| Aug 5, 2025 | Completed final sign-off Sep 2025 | 364 Eddy St | 3rd floor bathroom remodel, replace tub with stall shower.Details
3rd floor bathroom remodel, replace tub with stall shower. | $10,000 |
| Jun 25, 2025 | Completed final sign-off Aug 2025 | 364 Eddy St | 5th floor - bathroom remodel: replace bathtub with stall showerDetails
5th floor - bathroom remodel: replace bathtub with stall shower | $25,000 |
| Feb 14, 2025 | Completed final sign-off Aug 2025 | 364 Eddy St | re-do bathroom wall + floor (2nd floor). replace room door at unit# 115. replace flooring + fix walls in unit# 117; 216 & 217. paint room # 117; 216 & 217.Details
re-do bathroom wall + floor (2nd floor). replace room door at unit# 115. replace flooring + fix walls in unit# 117; 216 & 217. paint room # 117; 216 & 217. | $35,000 |
| Jun 2, 2017 | Completed final sign-off Mar 2018 | 1970 36th Av | kitchen and bathroom remodel, add new bathroom in garage, exhaust fans in kitchen/bathroon, change exterior windows 7 aluminum to new wood aluminum clad, no proposed building expansion.Details
kitchen and bathroom remodel, add new bathroom in garage, exhaust fans in kitchen/bathroon, change exterior windows 7 aluminum to new wood aluminum clad, no proposed building expansion. | $148,000 |
| Feb 26, 2016 | Never finaled issued Feb 2016, no final | 433 Ellis St | add electrical outlets in all rooms, 60 total. install tiles in front of common bathroom on 1st, 2nd and 3rd floors.Details
add electrical outlets in all rooms, 60 total. install tiles in front of common bathroom on 1st, 2nd and 3rd floors. | $6,200 |