Back to bathroom remodel contractors
Swanson Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2003 to Jan 2018
- Last 24 months
- 0 permits filed
36 permits since 2000: 28 completed, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 4 completed, 2 never finaled, 1 expired or cancelled. Typically 12 days from filing to permit and 307 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2017 | Completed final sign-off Jun 2020 | 1865 Filbert St | per unit legalization ordinance# 43-14. legalize rear building (e)cottage to single house with 2 bedroom & 2 baths.Details
per unit legalization ordinance# 43-14. legalize rear building (e)cottage to single house with 2 bedroom & 2 baths. | $2,000 |
| Jan 20, 2017 | Completed final sign-off Jan 2018 | 679 Moultrie St | expand bathroom into the existing bathroom closet space. remove bathtub. relocate toilet. install shower on south wallDetails
expand bathroom into the existing bathroom closet space. remove bathtub. relocate toilet. install shower on south wall | $20,000 |
| Apr 29, 2016 | Expired or cancelled expired Apr 2019 | 419 Panorama Dr | remodel build out of (e) garage (level 1) with den, master bedroom and bathroom. level 1 & 2 shall be connected with in kind open staircase. replacing windows and adding 1 new window.Details
remodel build out of (e) garage (level 1) with den, master bedroom and bathroom. level 1 & 2 shall be connected with in kind open staircase. replacing windows and adding 1 new window. | $90,000 |
| Oct 7, 2014 | Never finaled issued Oct 2014, no final | 473 Frederick St | unit #473: new interior wall opening between kitchen and living room. add a new bathroom.Details
unit #473: new interior wall opening between kitchen and living room. add a new bathroom. | $12,000 |
| Jun 24, 2014 | Never finaled issued Jun 2014, no final | 471 Frederick St | remodel kitchen & bath. no lighting work at remodel area.Details
remodel kitchen & bath. no lighting work at remodel area. | $30,000 |
| Apr 28, 2006 | Completed final sign-off Mar 2007 | 5 Perego Tr | frame out of storage space and remodel of two full bathrooms. to create breakfast room & living room.Details
frame out of storage space and remodel of two full bathrooms. to create breakfast room & living room. | $60,000 |
| Nov 13, 2003 | Completed final sign-off Jun 2004 | 1914 Pine St | demo bathroom walls,sheetrock all walls in ceiling.clone off hallway door access to bathrm. useDetails
demo bathroom walls,sheetrock all walls in ceiling.clone off hallway door access to bathrm. use | $15,000 |